Responds to NRC Re Violations Noted in IE Insp Repts 50-321/80-02 & 50-366/80-02.Corrective Actions: Retrofit Insp Will Be Conducted of Sampling Sprinkler Sys Valves,Piping,Spray Heads & Hangers
ML19312D912
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/28/1980
From: Widner W
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19312D907 List:
References
NUDOCS 8005050348
Download: ML19312D912 (1)


Text

3 ()05 0 5 Of Georgia Power Cornpany 230 Peachtree Street g

Post Office Box 4545 i

Atlanta, Georgia 30302 Telephone 404 522-6060 e

O E

Power Generation Department

,] [pg p l. g3 rw n, m.m m tre v.

March 28, 1980 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street, NW Atlanta, Georgia 30303 ATTENTION:

Mr. James P. O'Reilly, Director Gentlemen:

The following is offered as a supplemental response to Deviation A in Inspection Report Numbers 30-321/80-02 and 50-366/80-02:

A retro-fit inspection will be conducted by Georgia Power Company Quality Control personnel of all sprinkler system valves and a representa-tive sample of associated piping, spray heads, and hangers to verify that they are of the design, type, size, etc., specified in design drawings or procurement documents. Representative samples will include not less than 10% of the items installed, and the inspection will be conducted only on those systems installed per commitments referenced in Table 3 of the Hatch Fire Protection Evaluation. Appropriate test results will be obtained for these sprinkler systems. This inspection will be completed by June 24, 1980.

Very truly yours,

{

(n.-],/ Y l

~

W. A. Widner Vice President and General Manager Nuclear Generation RDB/mb d