Text
_.
j amee, w.
/
- [ h j
e UNITED ' r ATES y
w g
NUCt. EAR REGULA1URY COMMtsslON
, g.]
{
j w ASHING TON. ').
C.
20555
,. \\.....
MAR 3 - 1980 Docket Nos. 50-456/457 ED4 Mr. D. Louis Peoples Director of Nuclear Licensing Comenwealth Edison Company P. O. Box 767 Chicago, Illinois 60690 l
Dear Mr. Peoples:
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 In light of your announced suspension of construction activities at the Braidwood Station, we need assurance that your quality assurance program i
includes appropriate measures to prevent degradation of quality that could result from such suspension. Therefore, please provide a description of the program measures you will initiate (or have initiated) to prevent degradation.
of quality of safety-mlated equipment, components, and structures during this delay. Your program may reference applicable portions of your current quality assurance program for design and construction, but should specifically
'y k
discuss and amplify, as necessary, the following three aspects of your present y
program:
~
m 1.
A requirement for the development and technical evaluation of procedures N.__
for preservation, packaging, storage, inspection, surveillance, and access e.o:
control of complete or partially complete construction and installation
~~4-of safety-related items.
2.
A requirement for the qualification and training requirements for personnel
,g.
developing, evaluating, and executing the procedures described in Item 1.
$[
3.
A requirement that as-built drawings be brought up-to-date to show the -
current status of plant completion.
Please provide your msponse within 30 days from the date of this letter.
. i.
We will then review the adequacy of your program.
- ~-
Sincerely.
-f f?%
E__h.
- p Lestef
- benstein, ting Chief Light Water Reactors Branch No. 4 Division of Project Management
..ts cc: See next page
~*W 5.
f,b 8003250050 n
MS$iiiiIb MMr.
Conronwealth Edisen Conpany ces:
Mr. Willian Kortier Atomic Power Distribution Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230 Paul M. Murphy, Esq.
Isham, Lincoln & Beale One First National Plaza 42nd Floor Chicago, Illinois 60603 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, Illinois 61107 Ms. Julianne Mahler Center for Governmental Studies florthern Illinois University DeKalb, Illinois 60115 C. Allen Bock, Esq.
l P. O. Box 342 Urbana, Illinois 61801 Thomas J. Gordon, Esq.
Waaler, Evans & Cordon 2503 S. Weil Champaign, Illinois 61820 Ms. Bridget Little Rorem Appleseed Coordinator 117 florth Linden Street Essex, Illinois 60935 l
l e
e I
O