O
'" [Ja asrug o
UNITED STATES 8 " -),, (,,{
NUCLE AR R EGULATORY. COMMISSIO A'"
/
5-g E
WASHINGTON, D. C. 20555 March 7, 1980 Docket No. 50-333 Mr. George T. Berry General Manager and Chief Engineer Power Authority of the State of New York 10 Columbus Circle New York, New York 10019
Dear Mr. Berry:
We have been reviewing your request to expand the spent fuel storage capacity at the James A. FitzPatrick Nuclear Power Plant. To assist us in our review, we request the information identified in the enclosure.
Please provide the requested information within 30 days of receipt of this letter.
Sincerely, Y&.
Y Thoma
. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors
Enclosure:
Request for Additional Information cc w/ enclosure: See next page l
l i
l 8 0 0 3 2406(g
Mr. George T. Berry Power Authority of the State of New York cc:
Mr.. Charles M. Pratt Assistant General Counsel Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. Peter W. Lyon Manager - Nuclear Operations Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. J. D. Leonard, Jr.
Resident Manager James A. FitzPatrick Nuclear Power Plant P. O. Box 41 Lycoming, New York 13093 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 State University College at Oswego Penfield Library - Documents Oswego, New York 13126 George M. Wilverding, Licensing Supervisor Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 I
)
Enclosure REQUEST FOR ADDITIONAL INFORMATION SPENT FUEL POOL CAPACITY EXPANSION J. A. FITZPATRICK NUCLEAR POWER PLANT
)
l For a situation where all fuel pool cooling is lost ~ (due to its being
~
non-safety grade equipment) for a period of more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> so that l
the water in the spent fuel pool starts to boil, please provide the followin; information for the expanded pool:
1.
The FitzPatrick plant's capability for removing vapors and liquids from the reactor building.
i i
2.
The access requirements for personnel entering the Reactor Building during and after-spent fuel pool boiling.
j 3.
The environmental oualifications of the safety related equipment which is located in the Reactor Building.
4.
Provisions for restoring cooling capability or a descriptionJof your ability to deal with a boiling pool indefinitely.
4 i
~
I
~
l
~. _ -.,., _
-