ML19312D300

From kanterella
Jump to navigation Jump to search
Approves 800204 Fuel Load Procedure Change.Revised Count & Signal Noise Ratio Provide Assurance of Detectability & Prevention of Criticality
ML19312D300
Person / Time
Site: Sequoyah  
Issue date: 03/05/1980
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Parris H
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8003240174
Download: ML19312D300 (2)


Text

-

...'w mR RfCut

(

o, UNITED STATES y

~

~

,g NUCLEAR REGULATORY COMMISSION E

WASHINGTON. D. C. 20555 MAR 5. 1980

~

Docket Nos.: 50-327/328-Mr. H. G. Parris Manager of Power Tennessee Valley Authority 500A Chestnut Street, Tower II Chattanooga, Tennessee 37401

Dear Mr.,

Parris:

SUBJECT:

FUEL LOAD PROCEDURE CHANGE FOR SEQUOYAH, Unit 1 In response to your letter of February 4,1980, on the subject matter, we find the proposed change in procedure to be acceptable'. The revised count

. rate'along with the required signal noise ratio provides assurance that any approach to criticality during fueling can be detected and steps taken to prevent criticality.

Please call if there are questions.

Sincerely.

g m.

-l. S.

/

L. S.' Rubenstein, Acting Chief Light Water Reactors, Branch No. 4 Division of Project Management cc: -See next page O

9 scos240 iW

,g

.d

Tennessee Valley Authority-

~

z.,

<ces

Herbert S. Sanger,.Jr. Esq.-

General Counsel-

-Tennessee Valley Authority-

400 Connerce Avenue-E 118 33-Knoxville, Tennessee: 37902 Mr. E'. G. Beasley'

. Tennessee. Valley Authority 1400 Commerce Avenue,. 249A HBB Knoxville, Tennessee 37902-

Mr. Michael. Harding Westinghouse Electric Corporation P. O. Box -355 Pittsburgh, Pennsylvania 15230 Mr. David Lambert.

Tenness'ee Valley Authority

~400 ~ Chestnut Street Tower II Chattanooga, Tennessee 37401-Mr. J. F. Cox cTennessee Valley Authority 400 Commerce Avenue,' W10Cl31C -

Knoxville, Tennessee 37902 Resident Inspector /Sequoyah NPS c/o U.S. Nuclear Regulatory Commission P. O. Box 699 Hixson, Tennessee 37343-t t

0 t

_ _ _ _ _ _ _ _