...'w mR RfCut
(
o, UNITED STATES y
~
~
,g NUCLEAR REGULATORY COMMISSION E
WASHINGTON. D. C. 20555 MAR 5. 1980
~
Docket Nos.: 50-327/328-Mr. H. G. Parris Manager of Power Tennessee Valley Authority 500A Chestnut Street, Tower II Chattanooga, Tennessee 37401
Dear Mr.,
Parris:
SUBJECT:
FUEL LOAD PROCEDURE CHANGE FOR SEQUOYAH, Unit 1 In response to your letter of February 4,1980, on the subject matter, we find the proposed change in procedure to be acceptable'. The revised count
. rate'along with the required signal noise ratio provides assurance that any approach to criticality during fueling can be detected and steps taken to prevent criticality.
Please call if there are questions.
Sincerely.
g m.
-l. S.
/
L. S.' Rubenstein, Acting Chief Light Water Reactors, Branch No. 4 Division of Project Management cc: -See next page O
9 scos240 iW
,g
.d
- Tennessee Valley Authority-
~
z.,
<ces
- Herbert S. Sanger,.Jr. Esq.-
General Counsel-
-Tennessee Valley Authority-
- 400 Connerce Avenue-E 118 33-Knoxville, Tennessee: 37902 Mr. E'. G. Beasley'
. Tennessee. Valley Authority 1400 Commerce Avenue,. 249A HBB Knoxville, Tennessee 37902-
- Mr. Michael. Harding Westinghouse Electric Corporation P. O. Box -355 Pittsburgh, Pennsylvania 15230 Mr. David Lambert.
Tenness'ee Valley Authority
~400 ~ Chestnut Street Tower II Chattanooga, Tennessee 37401-Mr. J. F. Cox cTennessee Valley Authority 400 Commerce Avenue,' W10Cl31C -
Knoxville, Tennessee 37902 Resident Inspector /Sequoyah NPS c/o U.S. Nuclear Regulatory Commission P. O. Box 699 Hixson, Tennessee 37343-t t