gg 14 N
~
60-2.7 D Mr. Daniel F. Ford Union of Concerned Scientists 1208 Massachusetts Avenue Canbridge, Massachusetts 02138 Dear Mr. Fordt i
l In your letter dated December 11, 1975, you requested information concerning a spill of radioactive water from Oconea 2.that resulted from a leaking valve and an ieproperly installed drain line.
With regard to your question concerning what plant components varo involved and why was the installation improper, we are enclosing a copy of the licensco's report of the incident (AO-270/75-19), dated October 17, 1975, and a subsequent report providing supplemental y
informatifon, dated December 29, 1975. Our post occurrence review I
of the facility drawings and the procedure utilized to conduct pre-
[
operational testing of this' drain pipe, revealed that a procedure deficiency existed. This procedure required the drain pipe be cut
)
for system flushing; however, the procedure did not include provisions for restoration following. completion of the flushing operation.
Your letter also inquired about the review of the involved equipment by both the Office of Nuclear Reactor Regulatic.
i' (Licensing) and the office of Inspection and Enforcement (IE). With respect to the I
reviews performed by Licensing, we are enclosing copies of the applie-able sections'of'the Safety Evaluations (SE) for these facilities j
uhich vore prepared by Licensing subsequent to completion of their reviews.
The SE for Oconce Unit I was issued on Dece:tber l
and for oconee Units 2 and 3 on July 6, 1973.
29, 1970,
[
IE's preoperational inspection program includes'an indepth review-I of a sample of specific' equipment fabrication, installation and' h,((D i
testing procedures to ascertain that the licensee has an' acceptable system to control the~overall' activities..
~
.a
. Understandatly, IE's 4
~. t 2
x
, %,a fswh 5 h ee-hm..h M1tfE44wghShos'e5 4%%dhk E' Nem N.
bM he b % W4 r,
= m e
a m
.N t '7 **
3"
[ '
e s
3a$
h 8001140g
.y
.o Tanici P. Ford ci.M,1,1 gi$
ara:,pling activities are highly concentrated in areas of mot safety significance.
The particular piping section and the flushing pro-cedure involvod here vere not considered of high safety si nificance E
nad therefore were not selected as part of the IE irspection sa:::ple.
We hope this infor: nation is responsive to your inquiry.
j Sincerely.
Original signyd lig -
J. C. Davis John G. Davis, Acting Director Office of Inspection end Enforcement
Enclosures:
As stated bec:
l N. C. Moseley. IE:Il l
K. R. Goller, NRR l
G. Zech, NRR l
G. Roy, IE j
LPDR (2) s l
S, D
f a
l Y
W\\
f w
._ FCEB,C'
_NP
~ ' ~
'p[E a "c
- d FADreh g;;y',;qk burg JGP'y M~T
~
Lp
~ i a~
f sa
,g g.3 l76; ~
! $/76 _.
1//3/76__..
1/P/ /76_._.
_1//J76...
- [h/76.. I Form AEC 318 (*.ev. 9 53) AECM 0240 W u.s.novaan swrensurine oprica
,e,....
g I
l