ML19312C874

From kanterella
Jump to navigation Jump to search
Informs of Interim Measures to Be Taken Until Analysis Complete or Design Mods Implemented Re Posutlated Feedwater Line Break in Turbine Bldg & Feedwater Break in Penetration Room
ML19312C874
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/05/1973
From: Thies A
DUKE POWER CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001130042
Download: ML19312C874 (2)


Text

..,

t i

DuxE Pownn GouvAny Powen 11cnomo Regulatory File Cy.

422 Sourn Cuuncu Srnr.r, Cuerorre,N.C. anaos 4

P 0 Dox 2 78

s...o.' vI.

a

^

,u,

Paoouction ay.t, Tn ns mio

\\

occmtD W

February 5, 1973 FEB9 1973 " Y

~

Y',%

t ttuTCRY /'

s rGt ECilM J

b k, /,%g,N *-l gf**f

.?

1, cocm cter*

Mr. Angelo Giambusso

",/ y Q 'd P

&.. k Deputy Director for Reactor Projects

4. O Director:'n of Licensing G_.

U. S. At Energy Cor:aission g g'c g ( I:

,(W,,y,g'

.qc,

Washingtt D. C.

20545 g

7 iM-g' 4

Re: Oconce Nuclear Station

, f g = y,, V I

Unit 1 Docket No. 50-269

Dear Mr. Giambusso:

Picase refer to my letter of January 26, 1973.

In that letter, you were informed that as a result of our continuing analysis on the postulated failure of lines containing high energy. fluids we would propose appropriate modifications to meet the interpretation of Criterion IV of the Cocsission's general design criteria. We also inforned you that we would leplement interim measures which could reduce the consequence of postulated high energy line ruptures, reduce the probability of occurrence, or assure that equipment needed to uitigate the accident is availabic.

On January 18, 1973, we met with members of your staff to present the results of our analysis to date and advised them that Oconce Unit 1 could be shut down safely in the event that a hypothetical accident identified by your criteria did occur.

In that accident analysis, we identified two instances where the single failure criteria may not have been met.

Consequently, interim measures will be taken until the analysis is complete or design modifications can be impicmented.

For postulated feedwater line break in the turbine building, we will take the following measures:

1.

Drill openings in the piping insulation near high stress locations on feedwater piping identified to you in our discussions on January

18. These areas will be visually observed once per shift to detect any leak.

2.

The auxiliary service water pump will be tested for a minimum time of one hour cach week to assure operability.

t 800 3130 a yS 4

7

\\

Mr. Angelo Giambusso Page 2 February 5,1973 3.

A redundant cable will be pulled from the 4160 auxiliary service water

' switchgear to the high pressure injection pu=ps.

This cable will be available for quick manual connection to any of the high pressure injection pu=ps should it be needed.

For the feedwater break in the penetration room, the following measures will be taken:

1.

The reactor building isolation valve in the high pressure injection line B (IIP 27) will be lef t open to reduce the probability of a single failure occurrence.

2.

Insulationonthefeedwaterlinesinthepenetrati[nroomwillbc l

drilled near the terminal ends and visually observed once per shift to detect any Icakage.

1 3.

An additional temperature detector vill be installed in the penetration room to give the operator information as to the occurrence and 'ocation of a break.

The above-mentioned temperature detector will be installed prior to March 15, 1973.

In addition to the above measures, ccergency procedures are being developed for the following situations: ' Loss of feedvater to the steam generators with the emergency feedwater system operable and loss of feedwater to the steam generators with the emergency feedwater system inoperable.

Also, the emergency procedure covering steam line break will be rcvised as required to include information resulting from our analysis.

We are also developing procedures for a surveillance program to inspect the areas of postulated ruptures.

Procedures for making visual exami-nations of the metal surfaces of the higher stress locations are also being developed. More information on this program will be forwarded to you within 10 days following initial criticality.

Very truly yours, C

i A. C. Thics ACT:vr i