Notifies That Reactor Bldg Insp Test Performed on 760602 Showed No Evidence of Deterioration of Containments Structural Integrity
ML19312C831
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/27/1976
From: Parker W
DUKE POWER CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8001100742
Download: ML19312C831 (1)


Text

. _

7 DlIKl? POWICH COMlW

( jf W.. <

Powrn Imita:wo

/,Tf - y," d 400 Socin Castruen Si ner.r, Cuant.orTr. N. C. en:342 I

,v p L LI A nd O PARWER,JR.

Vit t I'et tscreet Tctre o%g; Anta 704

$9 t s ee PpC DwCTiO*s 373 4092 I

August 27, 1976 i

Mr. Norman C. Moseley, Director 1

U. S. Nuclear Regulatory Commission l

Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Re: Oconee Unit 2 l

Docket No. 50-270

Dear Mr. Moseley:

On June 2,1976, the annual inspection of Oconce Unit 2 Reactor Building was completed pursuant to Technical Specification 4.4.1.4.

The inspection was performed in accordance with approved test pro-4 cedure PT/0/A/0150/16, Reactor Building Inspect. ion Test.

A visual examination was made of accessibic interior and exterior surfaces of the containment structure.

No discrepancies were e.>ted other than those reported in the previous Oconee Unit 2 Reactor Building inspection report as transmitted by our letter of March 13, j

1975. These discrepancies Aneluded grease seepage through construction joints at exterior locations on the Reactor Building and grease leakage f

arounc tendon grease caps and filler plugs.

Corrective action per-i formed ou the Icaking grease caps included the application'of scalant j

tape to the grease plug thecads and retorquing of the bolts. This action was effective in redt.cing grease leakage to a minimum.

From this inspection no evidence of deterioration was found which I

could affect the containment's structural integrity or leak tightness.

/

Ve truly yours u.L d.

William O. Parker, Jr.g-EDB:vr i