Text
. _
7 DlIKl? POWICH COMlW
( jf W.. <
Powrn Imita:wo
/,Tf - y," d 400 Socin Castruen Si ner.r, Cuant.orTr. N. C. en:342 I
,v p L LI A nd O PARWER,JR.
Vit t I'et tscreet Tctre o%g; Anta 704
$9 t s ee PpC DwCTiO*s 373 4092 I
August 27, 1976 i
Mr. Norman C. Moseley, Director 1
U. S. Nuclear Regulatory Commission l
Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Re: Oconee Unit 2 l
Docket No. 50-270
Dear Mr. Moseley:
On June 2,1976, the annual inspection of Oconce Unit 2 Reactor Building was completed pursuant to Technical Specification 4.4.1.4.
The inspection was performed in accordance with approved test pro-4 cedure PT/0/A/0150/16, Reactor Building Inspect. ion Test.
A visual examination was made of accessibic interior and exterior surfaces of the containment structure.
No discrepancies were e.>ted other than those reported in the previous Oconee Unit 2 Reactor Building inspection report as transmitted by our letter of March 13, j
1975. These discrepancies Aneluded grease seepage through construction joints at exterior locations on the Reactor Building and grease leakage f
arounc tendon grease caps and filler plugs.
Corrective action per-i formed ou the Icaking grease caps included the application'of scalant j
tape to the grease plug thecads and retorquing of the bolts. This action was effective in redt.cing grease leakage to a minimum.
From this inspection no evidence of deterioration was found which I
could affect the containment's structural integrity or leak tightness.
/
Ve truly yours u.L d.
William O. Parker, Jr.g-EDB:vr i
8 001100 N
.