ML19312C828

From kanterella
Jump to navigation Jump to search
Recommends post-notice of Util Reload Amend Request.No Environ Statement or Negative Declaration Required
ML19312C828
Person / Time
Site: Oconee 
Issue date: 11/21/1977
From: Neighbors D
Office of Nuclear Reactor Regulation
To:
NRC COMMISSION (OCM)
References
NUDOCS 8001100738
Download: ML19312C828 (2)


Text

_

n'

>?

ro-139 f

?

4v (1

c' PRELIMINARY DETERMINATION _

NOTICING OF PROPOSED LICENSING AMENDMENT _

Duke Power Company (Oconee Unit 3)

LICENSEE:

Technical Specification changes related to Oconee Unit 3, Cycle 3.

REQUEST FOR:

September 6, 1977 l REQUEST DATE:

Pre-notice Recom:nended PROPOSED ACTION:

( )

Post-notice Recommended

( X)

Detennination delayed pending

( )

coupletion of Safety Evaluation h Oconee BASIS FOR DECISION: This reload amendment request is th i

j The first two reloads were for Oconee 1 and Oconee i 2, and the Preliminary Determinations for these amendments fo of evaluation.

These were PD-127 and PD-130.

Also, post-notices acceptable.

29, 1977, the Oconee Unit 2 reload amendment which was issued on July concluded that no significant hazards consideration was involved.

i

'k1 8001100 73I[

I PD-139

~

~ Proposed NEPA Action:

( ) EIS Required Negative Declaration (ND) and Environmental Impact

( )

Appraisal (EI A) Required (X) No EIS, ND or EI A Required Determination delayed pending cor.:pletion of EIA

( )

d no change in BASIS FOR DECISION: No change in effluent types or amounts an power level.

l l

DATE:

CONCURRENCES; 9//II

1. DNeiahbors Ofd'

'Cr tem 4%9//f/

2. A. Schwencer

/

3. E. -R. OpJter,

=9/

/

A

{

9/ /7 j D

-