ML19312C791
| ML19312C791 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/21/1967 |
| From: | Long C US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7912191010 | |
| Download: ML19312C791 (2) | |
Text
_ _ _ _ _ _ _
, = _ _,
,.A g
UNITED STATES GOVERNMENT Memorandum To Peter A. Morris, Director DATE:
April 21, 1967 Division of Reactor Licensing FRO.41 Charles G. Long, Chief Reactor Project Branch 3
^~
Division of Reactor Licensing
_.s
SUBJECT:
AGENM (see attachment) FOR FORTHCOMING MEETING WITH DUKE POWER CG(PANY Time and Date:
9 a.m. - April 27, 1967 Location:
Room 107 - Bethesda
Purpose:
To discuss the answers submitted by Duke Power Company in Supplements 1 and 2 to the Oconee construction permit application, Docket Nos. 50-269/270.
l Groups Participating:
Reactor Project Branch 3, DEL Reactor Technology branches, DRL Duke Power Company (W. S. Lee et al)
Babcock & Wilcox (R. Wascher et al)
Distributiod M. M. Mann, REG C. L. Henderson, REG Assistant Directors, DEL Branch Chiefs, DRL Director, DRS Branch Chiefs, DRS R. F. Fraley CO B. Grimes e
c s
t
(
b Bay U.S. Savings Bonds Regularly on the Payroll Savings Plan 7912191
[
7 l
DUKE POWER COMPANY (Oconee Nuclear Station Units 1 & 2)
DOCKET NOS. 50-269/270 AGENDA FOR APRIL 27. 1967 1.
Discuss the revised accident analysis a.
Site meteorology x
e t
b.
Engineered safety features 2.
Instrumentation 1
3.
Thermal analysis
)
4.
Containment design 5.
Penetration design and leakage considerations 6.
Emergency power 7.
Seismic analysis of the dans and other site considerations 8.
Rod drives 9.
Turbine missile analysis i
.-