ML19312C753
| ML19312C753 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/09/1978 |
| From: | Parker W DUKE POWER CO. |
| To: | Case E, Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7912190963 | |
| Download: ML19312C753 (2) | |
Text
y y my WRCPops1rf.
U.S. NUCLEAR GEGULATORY COMMlU OCCKET
[O 2 %
.3 3]
- .761 RC DISTRIBUTION PoR PART 50 DOCKET MATERI AL
[O:
FROM:
cATE CP OCCUMENT Duke Power Company 1/09/78 Mr. Edson G. Case Charlotte, North Carolina cATE RECE:
l William O. Parker, Jr.
1/b/78 k&TTE A CNOTORIZED
- RCP INPUT PORM NUMBER CP COPIES RECEIVED hDICINAL hNCLAS$1 PIED C c="
l Sinnen
- ESCRIPTICN ENCLOSU RE Advising that there will be a delay re the submittal of requested info. concerning the Oconee Turbine Building Flooding Problem...
(1-P)
PI. ANT NA.I:
Oconee Units 1-2-3 V
.RJL 1/13/78 SAFETY FOR ACTION /INFORMATION IBRANCH CHIEF: (7)
I SC. k u.) M C SR I
i t
i I
I i
INTERNAL DISTRIBUTION l
I f
l rar eLa m I
b r anR I
l it
- e. rm I
I I
I nnn I
i i
f
l l
1 rurev I
I i
i j
rT c T r ut'*
I f
sum 1
i PA n i
i 5tm n I
r
! ERTvv9 I
I l
l (J. COLLINS I
I I
l l
1 L'. MC00ccH I
I l
l I t i
i
! I I
i i
I i i
i i I l
l l
! i i
l i i I
l I
i 1
i l
i !
i l
i EXTERNAL DISTRIBUTION X:ONTROL NUMBER
+g LPOR: WALK &Mn Sif 1 i Mc l,
l' 9 219n963 r
s 7eo1aooot s
u ss 1e ces s:Nr cirscrax s
i il i
n l
3 a
..)
.o
- -j.
. ~
~~".
t g
J.*
DUKE POWER OMyANY..
Powra Buttarwo 422 SocTu Cauncu Srazer, CaanwrTz. N. C. asa4a wiw*u o. Paa aca. sa.
January 9, 1978 Vice Pats QEMT Ttl.E*=CNC! AR C A 704 Sf Emma PacowCTion 373-4063
.kN i
m Mr. Edson G. Case, Acting Director c(
- h f.\\ Y -
N ' ~ 4.:,
~
55 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 6) gep g,
D Washington, D. C.
20555
- - v fc/3 5 :-3:
Attention:
Mr. A. Schwencer, Chief
+?., ' TR%:pn:n [j Ni t :,
g Operating Reactors Branch #1 Docket Nos. 50-269, -270, -287
, doi
Dear Sir:
In your letter of November 10, 1977, additional information was requested concerning the Oconee Nuclear Station Turbine Building Flooding Problem.
The answers to these questions were scheduled to be provided by January 16, 1978, but will be delayed until af ter a joint NRC/DPR meeting to be held.in Washington on January 18, 1978.. At this meeting, a description of an independent safe shutdoun facility, which Duke is considering in-stalling at Oconee, will be presented. This system would address security and fire protection concerns as well as the Turbine Building flooding issue at Oconee Nuclear Station.
Very uly yours,
/
0% 6. <
s William O. Parker, Jr. /
RLG:ge 790130001
%