Text
r
~
NRC DL,s RIBUTION FOR PART 50 DOCKET.ATERIAL
- (TEMPORARY FORM)
CONTROL NO-13046
,a FILE:
FROM: Duke Pover company DATE OF DOC DATE REC'D LTR TWX RPT OTHER
- ff' 11-10-75 11-14-75 xx
- TO:
Mr*:L.C. Eusche 3 signed 37 SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
xxx 40
@ 70/287 DESCRIPTION: Ltr notarized 11-10-75 request ENCLOSURES:
for chenge to Tech Specs re control rod &
operational withdrawal limits & furn info
_ ; 2,_ _ l's re ECCS & vith attached Fugures 3.5.2.la2 &
~
3.5-21....
fc,..,...... --. ~ a PLANT NAME: oconee 1-2-3 FOR ACTION /INFC.RMATION DE 11-15-75 BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REG AN (E)
REID(L)
W/ Copies W/ Copies W/ Copies W/ Copies W/ COPIES CLARK (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copics W/ Copies W/ Copies W/ Copies PARR (L)
VASSALLO (L)
KNIGHTON (E)
SPIES W/ Copies W/ Copies W/ Copies.
W/ Cco dPM d,ies2,3Cg -
KNIE L (C) 4URjLE (L)
YOUNGBLOOD (E)
W/ Copies W4Sopies W/ Copies W/g Lopics INTERNAL DISTRIBUTION MG F t f : 9 TECH REVIEW DENTON LIC ASST A/T IND.
FN n L i'U H (3 )
SCHROEDER.
GRIMES R. DIGGS (L)
B R AITM AN'.
~
NGC, ROOM P-506A MACCARY G AMMILL H. GE ARIN (L)
SALTZM AN-
$GOSSICK/ STAFF JNIGHT KASTNER E. GOULBOURNE (L)
MELTZ dASE FPAWLICKl BALLARD P. KPEUTZER (E) r l
GIAMBUSSO SHAO SPANG LER J. LEE (L)
PLANS
@OYD dTELLO M. RU31TEROOK(L)
K1CDONALD MOORE (L)
-lOUST ENVIRO S. REED (E)
CHAPMAN DEYOUNG (L)
@ OVA MULLER M. SERVICE (L)
DUBE (Ltr) l SKOVHOLT (L) g&OSS DICKER
- 44. SHEPPARD (L)
E. COUPE l
GOLLER (L) (Ltr)
POLITO KNIGHTON M. SLATER (E)
PETERSON l
P. CO L LINS EDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L)
KLECKER REG OPR LAIN AS 4 OJECT LDR G. WI LLI AMS (E)-
EISENHUT plLE & REGION (2)
BENAROYA 4 Sf V. WILSON (L)
WIGGINTON, MIPC VOLLMER HAWE R. INGR ' M (L)
{.
M. DUNCAN (a EXTENNAL DISTRIBUTION M-LOCAL PDR tulkn11a, S.C.
W-TIC (ABERNATHY)
(1)(2)(10) - N ATION AL LABS 1 - PD R. SAN /LA/NY W-NSIC (BUCHANAN) 1 - W. PENNINGTON, Rrn E.201 GT 1 - BROOKHAVEN NAT LAB l
1 -- ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORN L g/r1 y Newton Andersong ACRS M 'SENT 79 Q, NEWMARK/BLUME/AGBABIAN jh 92/
- A 4
DUKE PowEn COMPANY Powen Dt:stotwo 42c SorTin Citrucu STarET. CnAntoTTE. N. C. 28242 In, NgTtg
- ,=;
m..- e naa.cn e
- x y
~?!)
t November 10, 1975 3'
/g g'.,
y
.L.,.~'.,-~j~
~.
y i.,..
L(l.'.f.k ~ % Ql
E.iff
,A Mr. Benard C. Rusche
/
Director of Nuclear Reactor Regulation D' I A
< ~ -
U. S. Nuclear Regulatory Commission
.c.
Washington, D. C.
20555 c,
w Attention:
ik. R. A. Purple, Chief Operating Reactors Branch #1 Re:
Oconee Nuclear Station Docket Nos. MO-260 3 270, -287
Dear Mr. Rusche:
As you are aware, the existing Technical Specifications for Oconee Unit 1 do not include the specification for control rod withdrawal limits (Figure 3.5.21A2) that are required to be used toward the end of the cycle, when Group 7 control rods are significantly with-drawn from the core.
This specification for control rod withdrawal limits was excluded because the Technical Specifications based on the ECCS Final Acceptance Criteria were expected to be approved before the time that the limits would be required; and, therefore, the limits that meet both the Interim Acceptance Criteria and the Final Acceptance Criteria were not submitted.
As indicated in my October 31, 1975 letter, the withdrawal of Group 7 control rods may be required when Unit 1 attains 235 EFPD (presently estimated to occur by December 1,1975). We understand that the NRC is reviewing the proposed Technical Specifications based on the re-evaluation of the ECCS performance submitted by Duke Power Company on July 9, 1975, and subsequently supplemented with additional information on August 1, 1975, October 10, 1975, and October 31, 1975. We urge the Commission to complete its review and grant approval of the ECCS re-evaluation and proposed Technical Specifications by December 1, 1975.
To enable continued full power operation of Oconee Unit 1 in the event Commission approval of the proposed Technical Specifications based on the Final Acceptance Criteria is not granted by December 1, 1975, Duke Power Company submits herewith (pursuant to 10CFR50, 850.90) proposed Technical Specifications for control rod and operational 13046 L
x
. - ~.
Mr. Benard C. Rusche Page 2 November 10, 1975 power imbalance limits (Figures 3.5.2-1A2 and 3.5.2-3A) which meet both the IAC and FAC.
In the event that the Commission is unable to approve the proposed Technical Specifications based on the FAC by December 1, 1975, we request that approval of the Oconee 1 Technical Specifications for control rod and operational power imbalance limits, which meet both the 1AC and the FAC, be granted no later than December 1, 1975.
Attached are the control rod position limits for four-pump operation applicable to the period after 245 1 10 EFPD (Figure 3.5.2-1A2) and the operational power imbalance limits (Figure 3.5.2-3A) which meet both the IAC and FAC for Oconee Unit 1.
Forty (40) copies of this request, including three signed originals, are enclosed.
V y truly yours,
~
dJ u a $.
William O. Parker, Jr. y PMA:vr Enclosures l
1 4
n.
Mr. Benard C. Rusche Page 3 November 10, 1975 WILLIAM 0. PARKER, JR., being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses DPR-38, DPR-47 and DPR-55, and that all stat ents and matters set forth therein are true and correct to the best of s knowledge.
- a ai l$).
William O. Parker, Jr.
(,)
Vice President ATTEST John C. Goodman, Jr.
Assistant Secretary Subscribed and sworn to before me this 10th day of November, 1975.
2d Y.
Notary Public My Commission Expires:
LX 0
/VYY
/
,