ML19312C475
| ML19312C475 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/17/1976 |
| From: | DUKE POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-76-07, IEB-76-7, NUDOCS 7912160004 | |
| Download: ML19312C475 (1) | |
Text
[
~
DUKE POWER COMPM ]
Powzu DettotNo
[. [, pf
[
422 SOUTH CHI;2CH Sinzzr, CHaretorrr., N. C. as24a I.*[
wsLUAM O. PAR K ER,,J R.
VsCe PatssotNT
?tttemont: Asta 704
,7,
Seta= PSCOUCTION 3 7 3-4 0 6 3j,"
August 17, 1976 Mr. Norman C. Moseley, Director U. S. Nuclear Regulatory Com:aission Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 RE:
IE:II:NCM 50-269 50-270 50-287
Dear Mr. Moseley:
In response to your letter of July 28, 1976 which transmitted IE Bulletin 76-07 concerning circuit modifications to crane hoist control systems, the following information is provided:
Regarding Items 1(a),1(b), and 2 in the bulletin, no modifications have been made or are planned to the main hoist brake release circuits for the Oconee 100 ton spent fuel cranes.
In reply to Item 1(c), we are satisfied that properly sized power contactors are supplied with the brake-release solenoids on the Oconee cranes.
These Whiting cranes utilize a main hoist eddy current brake when the solenoids release the mechanical brakes. These solenoids are powered by the 600 VAC main hoist motor contactor, which is a Westinghouse A/200 size 4 three-pole reversing contactor.
The main hoist motor is rated at 75 horsepower.
Spent fuel casks have been handled by both of the Oconee cranes and no problems have been encountered in the braking of suspended loads.
It is felt that no additional functional testing of this Oconee equipment is necessary.
Very truly yours, he