Responds to IE Bulletin 78-06, Defective Cutler-Hammer, Type M Relays W/Dc Coils. Cutler-Hammer Type M Dc Relays Will Be Replaced or Verified for Acceptable Arc Gaps by 781130
ML19312C324
Person / Time
Site: Oconee  
Issue date: 08/04/1978
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-78-06, IEB-78-6, NUDOCS 7912130853
Download: ML19312C324 (1)


Text

-

l

' j. s *,l DUKE POWER CO>fP2 i'

Y"~ n 'N

~

(;g. g_,',g-Powtu Duru>mc.

4cn SocTn Gnuncu Srnrrr, CnAnt.orir. N. C. es242 p.;-

wiuim o. e4aua. s a.

~ August 4, 1978 Vie r Pats *0Ee.T Tt6t>=ONE: AmLa 704 Stra peoou::T i o *.

373-4333 Mr. James P. O'Reilly, Director Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Suite 3100, 101 Marietta Street Atlanta, Georgia 30303 Re:

Oconee Nuclear S Docket Numbeg 50-269, 50-270 and 50-287

Dear Mr. O'Reilly:

My letter of June 7,1978 in response to IE Bulletin 78-06 stated that Cutler-Hammer Type M DC relays at Keowee Hydro Station and in all three Oconee units would be either replaced or verified to have acceptabic are gaps by the end of the third refueling outage of 1978, or approximately November 30, 1978. This work has been completed for Oconee 3 and is in progress at Keowee. However, due to the requirements of 10CFR Part 21 being applicable to current procure-ment, sufficient replacement relays will not be available to complete this effort on Oconee 1, and possibly Oconee 2, during forthcoming refueling out-ages.

(It is understood that Cutler-Hammer representatives have discussed this matter with your staff.)

Relay verification and/or replacement will proceed on Oconee 1 and 2 following resolution of this procurement problem.