ML19312C235

From kanterella
Jump to navigation Jump to search
Forwards LER 78-007/03L-0 & 78-009/03L-0
Date released: 11/22/2019 Download: ML19312C235


LER 78-009/03L-0:on 780322,Unit 2 Failed to Start.Caused by Field Flashing Breaker Failure.Breaker Failed on Five Previous Occasions.No Cause for Breaker Failure Found. Monitoring & Investigation Will Continue
ML19312C238
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/21/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312C238 (2)
LER 78-007/03L-0:on 780314,Unit 2 Failed to Start.Caused by Field Flashing Breaker Failure.Breaker Failed Four Times Previously.Cause of Breaker Failure Not Determined. Monitoring & Investigation Will Continue
ML19312C237
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/21/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312C237 (1)
RO-269/78-07 & 09:on 780314 & 22,field Flashing Breaker Found Inoperable.Cause for Repeated Inoperability Has Not Been Determined.Faulty Relays Replaced Before 780322 Failure.Recorder Will Be Installed to Monitor Trip Circuits
ML19312C236
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/21/1978
From:
DUKE POWER CO.
To:
References
Download: ML19312C236 (2)
Forwards LER 78-007/03L-0 & 78-009/03L-0
ML19312C234
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/21/1978
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312C234 (2)