ML19312C137

From kanterella
Jump to navigation Jump to search
Forwards Info Re Jocassee Dam in Response to NRC Request at 760921 Meeting.W/O Encl
ML19312C137
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/01/1976
From: Parker W
DUKE POWER CO.
To: Rusche B
Office of Nuclear Reactor Regulation
References
NUDOCS 7912060691
Download: ML19312C137 (2)


Text

.,J.

DUKE PowEn COMPANY Powzu BUILDIwo 4::2 Sourn Gnuncu SrnerT, CnAHLoTTE, N. C. 28242 WILLeAM O. PA R K E R. J R.

WCf PRES 6 DENT TEif *"C NCI AR E A 704

$t t a u PoOOwC*iO**

373-4083 October 1, 1976

.'!,N

../

/

. N/

's 5

-^

Mr. Benard C. Rusche k/

.f k'.i \\\\h)

Director of Nuclear Reactor Regulation O'

kM- ' c%#.'. g U. S. Nuclear Regulatory Commission g-O[t

'QA --

Washington, D. C.

20555 G g.s*0heD*

~

Re:

Oconee Nuclear Station N

-,.QG s

Docket Nos. 50-269, -270, -287 (C'e

Dear Mr. Rusche:

In response to a request for information concerning the Jocassee Dam during a September 21, 1976 meeting with your staff, three copies of the following information is provided:

1.

Jocassee Dam Quality Control Test Results 3~;~ytyv db J i.h [. ;-

- - ~

U.L & i; %,,

2.

Duke Power Company Keowee-Toxaway Pr'., ject Jocassee Development Summary of Materials Testing and Stability Design 3.

Consulting Board Reports:

(a) August 15, 1975

,C (b) December 10, 1975

,[ '

(c) May 20, 1976 b

c3a v

4.

Engineering Geology (O!

y Keowee-Toxaway Project 4

f -

i-0 lP (a) December 16, 1975 (Report)

D

.L.

(b) September 15, 1973 (Supplement)

\\-

c' (c) Figure 1-3 Geology and Foundation Plans

}

N 5.

Prints of Drawings (a) J-25 Dam and Cofferdams-Plan and Layout (b) J-26 Core Trench-Plan, Sections and Details

~

(c) J-27 Dam, Cofferdams and Core Trench-Sections and Details 7 912 060 hY"10151

  • ' ~ ~

i p

r x.

1 1

Mr. Eenard C. Rusche Page 2 October 1, 1975 4

6.

Law Engineering Testing Company Reports:

(a) Jocassee Hydro-Station Seismic Studies Summary Report, dated September 30, 1976 i

(b) Letter Report dated September 30, 1976 regarding possible l

Maximum Acceleration at Oconee Nuclear Station from Jocassee I

Reservoir Induced Seismicity.

Ve truly yours,

/

s e z..

LA -

i William O. Parker, Jr MST:vr Enclosures 1

I l

l l

I