Forwards Info Re Scheduled Refuelings in Response to NRC 750701 Request
ML19312C127
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/06/1975
From: Parker
DUKE POWER CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7912060676
Download: ML19312C127 (3)


Text

.

s.

~

DUKE POWER COMPANY W

l'OWER llPII. DING 422 Sot:in Cuvacu StueEr. CnAnt.orre, N. C. una.ta M'.%C,_

weuimu u r anca,sa.

' )/pl N

v.cc e c..oc,

s,c.- e oouct,0~

//

Tcoc.o c:4.c.70.

g 373..o83 f., (

'. ' ' \\

~

August 6, 1975 O!-

-'\\

s

-Q,' ~,,.

sc..c

-4 Mr. A,ngelo Giambusso, Directo f j< i !M('N -

Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re: Oconee Nuclear ation Docket Nos.

0-2

-270, -287

Dear Mr. Giambusso:

Mr. Karl R. Go11er's letter of July 1,1975 requested information concerning the scheduled refuelings of the Oconee nuclear units.

This information has been complied and is attached for your use.

Very truly yours, N

D.

M William 0. Parker, Jr.

MST:vr Attachment i

l l

I 7912060h 8447

'\\

i litgLd.

t i m' REFUELING INFORMATION 3-d-Y 1.

Name of Facility Oconee Nuclear Station Units 1, 2 and 3 2.

Scheduled date of next refueling Oconee 1 March, 1976 Oconee 2 May, 1976 Oconce 3 October, 1976 3

Scheduled date for restart following refueling Oconee 1 April, 1976 Oconee 2 June, 1976 Oconee 3 November, 1976 4.

Will refueli.ng or resumption of operation thereafter require a technical specification change or cther IIcense amendment?

If yes, what, in general, will these be?

The following changes to Technical Specifications are anticipated for Oconee reload fuel:

Technical Specification Subject Changes 2.1 Safety Limits and Limiting (a) Data in bases Safety System Settings (b) Pressure-temperature limit figures (c) Power / imbalance limit figures 1

23 Limiting Safety System Settings,(a) Pump monitor trips Protective Instrumentation (b) Data in bases (c) Pressure-temperature setpoint figures (d) Power / imbalance setpoint figures (c) Trip setting limit tables 3.5 2 Control Rod Group and Power (a) Power / imbalance limit Distribution Limits figures (b) Power / rod position i

limit figures (c) Tilt limit require-I ments 1

3.11 Maximum Power Restriction (a) Allowable fuel burnup l

L.

t.

5 scheduled date(s) for submitting proposed licensing action and supporting information.

Information will be supplied at least 90 days prior to the planned startup date following a refueling.

6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods.significant changes in fuel design, new operating procedures.

The only important licensing consideration anticipated in the near. future would relate to the use of a small-number of test pins or demonstration assemblies such as the Babcock and Wilcox Mark C (17 x 17) assembly, in Oconee 2.

.