ML19312C003

From kanterella
Jump to navigation Jump to search
Forwards Proposed Tech Specs 6.1,6.2 & 6.3 Re Administrative Controls,Action to Be Taken in Event of Incident Reportable to NRC & Action to Be Taken in Event Safety Limit Exceeded. Supercedes 750228 Submittal
ML19312C003
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/19/1975
From: Thies A
DUKE POWER CO.
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
Shared Package
ML19312C005 List:
References
NUDOCS 7911270780
Download: ML19312C003 (4)


Text

~

NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL (TEMPORARY FORM)

CONTROL NO: 6863 FILE:

Duke Power Company DATE OF DOC DATE REC'D LTR TWX RPT OTHER FROM: Charlotte, N C A C Thies 6-19-75 6-26-75 n

ORIG CC OTHER SENT NRC PDR N

Mr. A Giambusso 1 signed SENT LOCAL PDR 2CCCC CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

cccc 1;0 0/287 Ltr notarized 6-19-75 trans ES: Proposed Amat to Tech spec:

O N

con-the following:

sists of revisions to Appendix A with regards to reporting requirements...

Io copies encl ree'd t

P_ ANT NAME: Oconee FOR ACTION /INFORMATION vtm 6-27-75 BUTLER (L)

SCHWENCER (L) ZIEMANN (L)

REGAN (E)

W/ Copics W/ Copics W/ Copics W/ Copics CLARK (L)

STOLZ (L)

DICKER (E)

LEAR (L)

W/ Copies W/ Copies W/ Copics W/ Copies PARR (L)

VASSALLO (L)

KNIGHTON (E) srIts W/ Copics W/ Copics W/ Copies W/ Copies KNIEL (L) j PURPLE (L)

YOUNGB LOOD (E)

Lai W/ Copies W& Copies W/ Ccpics W/ copies INTERNAL DISTRIBUTION

(%m F t' C TECH REVIEW DENTON LIC ASST A/T IN D.

NRC POR SCHROEDER GRIMES R. DIGGS (L)

B R AITM AN f0GC. RCOM P SCGA MACCARY GAMMILL H. GE ARIN (L)

SALTZMAN

/GOSSICK/STAF F KNIGHT KASTNER E. GOULBOURNE (L)

MELTZ CASE PAWLICKI BALLARD P. KREUTZER (E)

GI AM BUSSO SHAO SP ANG l.E R J. LEE (L)

PLANS BOYD STELLO M. MAIGRET (L)

MCDONALD MOORE (L)

HOUSTON E NVI R O_

S. REED (E)

CHAPMAN DEYOUNG (L)

NOVAK MULLER M. SERVICE (L)

DUCE (Ltr)

SKOVHOLT (L)

ROSS DICKER S. SHEPPARD (L)

E. COUPE GOLLER (L) (Ltr)

IPPOLITO KNIGHTON M. SLATER (E)

PETERSON P. CO t. LINS TEDESCO YOUNGBLOOD H. SMITH (L)

HARTFIELD (2)

DENISE LONG REGAN S. TEETS (L)

KLECKER j REG OPR CM jM.

V. WILSON (L)

WIGGINTON LAIN AS PROJ T LDR G. WILLI AMS (E)

EISENHUT FILE & REGION (2)

BENAROYA E.WESj.

MIPC VOLLMER HARL R. INGR AM (L) j M. DUUCAN L"S EXTERN AL DISTRIBUTION s

/1 - LOCAL PDR. Walhana, SC

/1 - TIC (AGERN ATiiY) (1)(2)(10) - NATIONAL LABS 1 - PDR SAN /LA/NY

/ 1 - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKH AVEN N A LAB 1 - ASLB 1 - CONSULTANTS 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWM ARK /BLUME/AGBABI AN g-ACRS HOLDING /SENT 7911270 7 fro

7

^

e DUKE POWER COMPANY Powra Buzz.orwo j

422 SouTu Cnunca STnzzT, CHARI.OTTE, N. C. 28201 A c THies P. o. Box 217e Samsom Vict P8EleCENT PeoDUCT10% ANO Te a N sasissioN June 19, 1975 C-x A

.h Mr. Angelo Giambusso, Director h

/

[

'q.

Division of Reactor Licensing l>~

Office of Nuclear Reactor Regulation C-q

'{

p U. S. Nuclear Regulatory Commission (g

g J

Washington, D. C.

20555 V

3 y

Re: Oconee Nuclear Station q

,v

/

Docket Nos. 50-269, -270, -287 N ' ', m g

. c;f

Dear Mr. Giambusso:

Pursuant to 10 CFR 50, 350.90, please find attached a proposed amend-ment to the Technical Specifications for Oconee Nuclear Station, Appendix A to Facility Operating Licenses DPR-38, -47, and -55 This proposed amendment supersedes my February 28, 1975 transmi ttal. Major changes from that previous submittal reflected in the attached are as follows:

(1) Section 6.1.2.1.a has been clarified with regard to procedure changes which are to be reviewed, i.e., all procedure changes other than editorial or typographical changes shall be reviewed.

(2) Section 6.1.2.1.a has been revised to incorporate provisions for temporary approvals.

(3) Approval requi rements for procedures, procedure changes, modifi-cations and tests and experiments have been clarified, see Sections 6.1.2.1.a, 6.1.2.1.c and 6.1.2.1.e of the attached.

(4) Minimum qualification requirements for reviewers of procedures, procedure changes, Technical Specification changes, and modifi-cations have been established, see Section 6.1.2.1.d of the attached. These qualification requirements are consistent with the provisions of Sections 4.3 and 4.4 of ANSI N18.1-1971; and, therefore, assure that reviews will be performed by personnel with minimum qualifications comparable to those applicable to station supervisors and responsible professional / technical personnel.

(5) Section 6.1.3 2.a has been revised to clarify that the NSRU is to perform broad, multi-discipline reviews.

SSS3

m.

e I

Mr. Angelo Giambusso Page 2

' June 19, 1975 (6) Minimum qualification requirements for NSRU members have been established, see Section 6.1.3 2.b of the attached. These qualifi-cation requirements are consistent with the provisions of Section 4.6.1 of ANSI N18.1-1971 and with the existing Oconee Technical Specifications (Section 6.1.2.2.d) and, therefore, assure that NSRU functions will be performed by personnel with minimum qualifi-cations ccmparable to those applicable to the " Engineer-in-Charge" of off-site technical support personnel and current independent review (NSRC) personnel.

(7) Section 6.1.3.5.b has been revised to specify a minimum time for preparation and transmittal of minutes of NSRU meetings.

(8) Section 6.1.3.$.d has been revised to specify a minimum time for preparation and transmittal of audit reports.

Very truly yours, f&

A. C. Thies ACT:vr Attachment

-~

Mr. Angelo Giambusso

.Page 3 June 19, 1975 A. C. THIES, being duly sworn, states that he is Senior Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses OPR-38, DPR-47 and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

A. C. Thies, Senior Vice President ATTEST:

/'

)

r "I.

O

/,

I Lewis F. Camp

)

Assistant Secretary Subscribed and sworn to before me this 19th day of June,1975 7.

~-

G.

,i,

'Gi i

Notary,Public My Commission Expires:

./

)d

'D 7. 5 o

._y, m-

. ~

y,,

3

, -- w

-wr

, ---