ML19312B978
| ML19312B978 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/29/1975 |
| From: | Thies A DUKE POWER CO. |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 7911270762 | |
| Download: ML19312B978 (2) | |
Text
'"
NRC ^STRIGUTION 7.'l PART EO COC'T MATE RI AL (TEiwCHARY FORM)
CONTROL NO:
6023
=
FILE:
DATE OF COC DATE REC'D LTR TWX RPT OTHER FROM: Duke Power Company Ch^.rlotte, N.C.
28201 5-29-75 6-2-75 XX A.C. Thies TO:
l OR!G CC OTHER SENT AEC PDR XX Mr. Norman C. Moseley
?
I signed SENT l.OCAL PDR XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXX 1
50-2(,9
~
DESCRIPTION:
Ler furnishing addl info re Tech ENCLOSURES:
)
X$ Specs 4.2.8 & 6.6.1.6 & adv that' final report will be submitted by Sept. 1,f 197 5...
- " ~
PLANT NA?.iEoconee Unit 1 FOR ACT!ON/iNFORT.'.ATION DHL 6-4-75 BUTLER (L)
~
SCHWENCER (L) ZIEMANN (L)
REG AN (E)
W/ Copics W/ Copics W/ Copies W/ Copics CLARK (L)
STOLZ (L)
DICKER (E)
LE AR (L)
W/ Copies W/ Copies W/ Cc:;ies W/ Cooies PARR : :
VAc;sa; ; n p )
emnuTO a e S PF.B W/ Copies W/ Copics W/ Copies W/ Copies KNIEL (L)
YURPLE (L)
YOUNGB LOOD (E)
LICE::SI::G PROJECT MA".10ER W/ Copics W
opies W/ Cc::ics W/ Copics INTERNAL DISTRICUTION
.. n-
.Eo':
TECH REVIEW DENTON
,LIC ASST.
A/T IN D
.ermc wH SCHROEDER GR! ides R. DIGGS (L)
BR AITi.i AN
[GC. RCO P E^EA f." ACCA R Y G AT.i?.il L L H. GE ARIN (L)
SA LTZM AN
' dOSSICK/ST A F T KNIGHT KASTNER E. GOULBOURNE (L)
MELTZ CASE
- DAWLICK!
BAl.LA R D P. KREUTZER (E)
GI A r.* BU SSO SHAO SPANG LE R J. LEE (L)
]LANS_
BOYD STELLO M. M AIG RET (L)
W.1CDONALD MOORE (L)
HOUSTON
_ E NVI R O.
S. REED (E)
M CHAPMAN DEYOUNG.(L)
NOVAK MU LLEit M. SERVICE (L) k'"*d""*"Y#Sb83 SKCVHOLT (L)
ROSS DICKER
- g. SHEPPARD (L)
WE. COUPE GOLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON P. CO L LINS TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE J. COLL 1::s REGAN S. TEE TS (L)
KLECKER
. BEG OPR LAIN AS
@O.FCT LDR G. WI LLI A?.iS (E)
EISENHUT
- WILE & REGION (2)
BENAROYA V. WILSON (L)
.WIGGINTO N STEELE VOLLMER HA LESS R. INGRAM (L)
MPIC
/..
EXTERNAL DISTRIBUTIO"
/
- LOCAL PDR walhalla, S.C.
TIC (ABEC.N ATliY)
(1)(2)(1C) - NATIONAL LASS 1 - PDR S AN/L A,'NY V, - NSIC (SUCH AN AN) 1 - W. PENN!::GTON Rm E 2C1 GT 1 - BROOKH AV u.-
a.
LAS 1 - ASLB 1 - CONSULTANTS 1 - G. ULRIKSON 0 2'.'-
. g/$ACRS.m
- Newton A.nderson NEWM ARK /B LUM E/AG B ASI AN 1 - AGMED (RUT:- G L C :.; A G
_..,SENT Hm B-127 GT 7 911270 762 l,ga RulpdS. Rm Ec
?)
n DuxE POWER COMPANY
~
I-Powro Burrorwo 422 SouTn Gnuncu Srazet, Camtr.oTTz, N. C. asaos h
N \\
g'ey..
P. o. Box 2174.
A c. THits N
Sagion Vice Passiogge I
yat.O~! Oa PeODUCTION ameD Tsaksassessoas May 29, 1975 g g p r,_ -
G" tese LS %en ten S
gg g
gaa StG38
~'
Mr. Norman C. Moseley, Director g
U. S. Nuclear Regulatory Commission Suite 818 230 Peachtree Street, Northwest i
Atlanta, Georgia 30303 Re: Oconee Nuclear Station l,.
Unit 1 M
9 Docket No. 50-269 gG4 7,
~
Dear Mr. Moseley:
The following information is submitted pursuant to Oconee Nuclear Station Technical Specifications 4.2.8 and 6.6.1.6.
During the initial (1974) refueling of Oconee 1, in accordance with Technical Specification 4.2.8, a "B" type reactor vessel surveillance specimen capsule was withdrawn for testing.
Testing of the material contained in the capsule has been performed as specified, and final evaluation of the data and preparation of a comprehensive report are currently in progress.
It is anticipated that a final report of the test results will be available not later than September 1, 1975.
V.ery truly yours, Aa A. C. Thies ACT:vr cc:
Mr. Angelo Giambusso 8023
-