ML19312B974
| ML19312B974 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/26/1974 |
| From: | Thies A DUKE POWER CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7911270758 | |
| Download: ML19312B974 (2) | |
Text
_
~
AEC DI LIBUTICN FOR PART 50 DOCKET MA" IAL (TEMPORARY FORM)
CONTROL NO:
2633 FILE:
FROM:
lDATEOFDOC DATE REC'D LTR MEMO RPT OTHER Duke Power Company Chcriotte, N. C. 28201 3-26-74 3-28-74 X
A. C. Thies TO:
A. Giambusso 1 signed SENT LOCAL PDR X
CLASS UNCLASS PROP INFO INPUT NO CYS REC'D D
NO:
XXX 1
270 i
DESCRIPTION:
ENCLOSURES:
Ltr re their 3-8-74 ler, furnishing info to oconee Tech Spec 3.5.2,........
ACKNOWLEDGED PLANT NAME: Oconee Units 1 & 2 FOR ACTION /INFORMATION 3-28-74 GC BUTLER (L) v'ICIMENCER(L)
ZIEMANN(L)
REGAN(E)
W/ Copies W/ 7 Copies W/ Copies W/ Copies CLARK (L)
ST0*,Z (L)
DICKER (E)
W/ Copies W/ Copies W/ Copies W/ Copies COLLER(L)
VASSALLO(L)
KNIGHTON(E)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)
SCHDiEL(L)
YOUNGBLOOD(E)
W/ Copies W/ Copies W/ Copies W/ Copics INTERNAL DISTRIBUTION Mc F T T3 TECH REVIEN DENTON A/T IND R PDR HENDRIE GRIMES LIC ASST BRAI'M.G SALICIA'i
'70GC, ROOM P-506A SCHROEDER GAMMILL DIGGS (L)
B. HURT MUNTZING/ STAFF MACCARY KASINER GEARIN (L)
CAS3 KNIGHT BALLARD vCOULBOURNE (L)
PLANS GIAFBUSSO PAWLICKI SPANGLER LEE (L)
MCDONALD BOYD SHA0 MAIGRET (L)
DUBE w/ Input udOORE (L)(BWR)
STELLO ENVIRO-REED (E)
M0 DEYOUNG(L)(PWR)
HOUSTON MULLER SERVICE (L)
C. MILES SKOVHOLT (L)
NOVAK DICKER SHEPPARD (L)
B. KING P. COLLINS ROSS KNIGHTON SLATER (E)
DENISE IPPOLITO YOUNGBLOOD SMITH (L)
/ REG OPR TEDESCO REGAN TEETS (L)
FILE & REGION (3)
LONG
'ROJECT LDR WADE (E)
MORRIS LAINAS WILLIAMS (E)
(-
STEELE BENAROYA HARLESS WILSON (L) g g g g8g Q EXTERNAL DISTRIBUTICN K6 VI - LOCAL PDR Walhalla. S. C.
(7 v1 - DTIE(ABERNATHY)
(1)(2)(10)-NATIONAL LAB'S 1-PDR-SA';/LA/NY
- 1 - NSIC(BUCHANAN) 1-ASLBP(E/W Bldg,Rm 529) 1-GERALD LELLCUCHE 1 - ASLB(YORE l-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. I.AB l-CONSULTANT'S 1-AGMED(Ruth Gusscan) 6 - CYS ACRS N SENT TO LIC. ASST.
NEWMARK/BLUME/AG3ABIAN EM-B-127, GT.
3-28-74 GOULBOURNE l-GERALD ULRIKSON...ORNL l-RD.. MULLER..F-309 G
D/
")
Ngu\\atorf get NB D
DUKE POWER COMPANY Powra Burt.orwo 4aa SouTu Cucacu STazzT, CuAntorrz, N. C. asaos A. C. Tu r cs se..on wc ens.oc=r P. O. Box as78 Peooveriom==o ina=senession March 26, 1974 Th
[J IS /4 _ J, f g.,,.
['4 j
Mr. Angelo Giambusso 9
Deputy Director for Reactor Projects
'W gg' p* y6 Directorate of Licensing
(
Office of Regulation U. S. Atomic Energy Commissio' Washington, D. C.
20545 Re: Oconee Nuclear Station Units 1 and 2 Docket Nos. 50-269 and -270
Dear Mr. Giambusso:
My letter of March 8, 1974 requested certain changes to Oconee Technical Specification 3.5.2.
In that letter, it was stated that for the locked rotor transient the DNBR was not noticeably affected by the higher values of the revised specific heat curve for uranium dioxide fuel.
During review of this requested change, members of your staff have asked if the 1.4 second flow measurement time constant (reported in Supplement 17 to the Oconee FSAR) was included in the locked rotor transient analysis.
Please be advised that the 1.4 second time constant was included in the analysis, and therefore, the conclusions reported in my March 8,1974 submittal are valid for both the revised specific heat curve and the flow measurement time constant of 1.4 seconds reported in Supplement 17.
Ve truly yours4' d. s.w ka,.
-w -
y C. Ihies ACT:vr
- I'
- y.,Y
/q, s.
~
fo f s
1~ ;
y,'
m u ~, -:>
s.~*>, 4 s
'- 7, w,
e N', - @
- u. s O
qn 4Go
() t)