ML19312B947
| ML19312B947 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/20/1974 |
| From: | Thies A DUKE POWER CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19312B949 | List: |
| References | |
| NUDOCS 7911270733 | |
| Download: ML19312B947 (3) | |
Text
e I
AEC DISTRIBUTION FOR PART 50 DOCKET MATERI AL (TEMPORARY FORM)
CONTROL NO: 9888 FILE:
FROM: Duke Power Company DATE OF DOC DATE REC'D LTR TWX RPT OTHER Charlotte, N. C.
28201 A. C. Thies 9-20-74 9-26-74 X
TO:
Mr. Giambusso 3 signed SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXXX XXX':
40 l
50-269 DESCRIPTION:
ENCLOSURES:
Ltr notarized 9-20-74, trans the following: < 1) ATTACHMENT 1-Proposed Tech Specs Changes
( 2) Babcock & Uilcox Rpt BAW-1409, "Oconce 1 Cycle 2 Reload Report". M
( 40 cys of ea encl rec'd)
PLANT NAME: Oconee Uni t # 1 FOR ACTION /INFORMATION 9-26-7/
AR BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REG AN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies PAR R (L)
VASSALLO (L)
KNIGHTON (E)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L)
/ PURPLE (L)
YOUNGBLOOD (E)
W/ Copies W/9 Copies W/ Copies W/ Copies w
INTERNAL DISTRIBUTION
,=A W TECH REVIEW DENTON LIC ASST A/T IN D
/AEC PDR GRIMES BRAITMAN
/OGC, ROOM P 506A SCHROEDER GAMMILL DIGGS (L)
SALTZMAN
/MUNTZING/ STAFF MACCARY KASTN ER GEARIN (L)
B. HURT CASE KNIGHT BALLARD GOULBOURNE (L)
GIAMBUSSO PAWLICKl SPANG LE R KREUTZER (E)
PLANS I
BOYD SHAO LEE (L)
MCDONALD MOORE (L) (BWR)
STELLO ENVIRO M AIG RET (L)
CHAPMAN
- DU BE w/in l
DEYOUNG (L) (PWR)
HOUSTON MULLER REED (E)
/ E. COUPE (putLtr)
SKOVHOLT (L)
NOVAK DICKER SERVICE (L)
/GOLLER (L) (Ltr)
ROSS KNIGHTON
/SHEPPARD (L)
P. CO LLINS IPPOLITO YOUNGBLOOD SLATER (E)
D. THOMPSON (2)
DENISE TEDESCO REGAN SMITH (L)
KLECKER REG OPR LONG
/ PROJECT LDR TEETS (L)
EISENHUT flLE & REGION (1)
LAINAS SCAI,ETTI WILLI AMS (E) 7 911'd70 733 [
MORRIS BENAROYA HAR LESS WILSON (L)
STEELE VOLlMER EXTERNAL DISTRIBUTION N
1 - LOCAL PDR_Halhdla, SC.
/
Yi - TIC (ABERNATHY) (1)(2)(10) - N ATIONAL LABS 1 - PD R-SAN /LA/NY
/1 - NSIC (BUCHANAN) 1 - ASLBP(E/W Bldg. Rm 529) 1 - BROOKHAVEN NAT LAB 1 - ASLB 1 - W. PENNINGTON, Rm E-201 GT 1 - G. U LRIKSON, ORN L 1 - Newton Anderson 1 - B&M SWINEBROAD, Rm E-201 GT 1 - AGMED (RUTH GUSSMAN)
/6 - ACRS g SENT TO LIS.- CONSULTANTS Rm B-127 GT S. SHEPPARD FOR DIST NEWMARK/BLUME/AGBABIAN 1 - R. D. MUELLER, Rm E-201
[
GT y.
NM317 I@J $93[
{
DUKE POWER COMPANY Powza Duss.orwo 422 Sourn Cnuncs: STnzzT, CHAn 4TTz,N.C.usaos A. c. Tuir..
se..o. vic P. s.or.'
P. O. Box 2:7o
>=oo c vio.
o T.4.s..wo.
D September 20, 1974 f1 7 NfUb ks) h\\
/
gEP261974 c. Ji Angelo Giachusso g
Deputy Director of Reactor Projects
" !?'rea -
e Directorate of Licensing office of Regulation U. S. Atomic Energy Commission Washington, D. C.
20545 V'D W RE: Oconee Unit 1 Docket No. 50-269
Dear Mr. Giambusso:
Please find attached for your review proposed changes to the Oconee 15 clear Station Technical Specifications.
The purpose of these revisions is to ensure operation of the Oconee Unit 1, Cycle 2 Core within appropriate fuel design criteria and LOCA limits.
Proposed changes are shown in Attachment 1 as replacement pages for the Oconee Nuclear Station Technical Specifications:
2.1 SAFETY LIMITS, REACTOR CORE 2.3 LIMITING SAFETY SYSTEMS SETTINGS, PROTECTIVE INSTRUMENTATION 3.5.2 CONTROL ROD GROUP AND POWER DISTRIBUTION LIMIT Also attached is the Babcock & Wilcox report BAW-1409, "Oconee 1 Cycle 2 Re-load Report." This report includes a summary of Cycle 2 operating parameters, and contains safety analyses supporting operations of the Oconee 1 Cycle 2 Core at rated power.
Refueling operations for Oconec Unit 1 are presently scheduled to cor'i nce on October 20, 1974, and power operation should resume on November 20, 1974.
Your prompt review of these proposed revisions is requested.
I i
Very truly yours,
}
(M5
~
A. C. Thies g
ACT:gje II 4
gSEP26;ggf5 w
s
~
<n
-4
Mr. Angelo Giambusso Page 2 September 20, 1974 A. C. THIES, being duly sworn, states that he is Senior Vice Prcsident of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Atomic Energy Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating License DPR-38; and that all statements and matters set forth therein are true and correct to the best of his knowledge.
$i
'S A. C. Thies, Senior Vice President ATTEST:
&b.e b Yl)
-u Dorothea B. Stroupe
/
Assistant Secretary Subscribed and sworn to before me this 20th day of September, 1974.
')W
& um1.W Notary Public 1
My Commission Expires:
~ W d 4.v'.~2
/977