ML19312B906

From kanterella
Jump to navigation Jump to search
Forwards Results of Unit 1 Clad Collapse Analysis Per B&W rept,BAW-10084 & Supports three-cycle Operation of Unit 1. Also Forwards Replacement Page 3.11-1 for Tech Specs Deleting Restriction Limiting Unit 1 Operation
Date released: 11/22/2019 Download: ML19312B906


Proposed Tech Spec 3.11 Deleting Restriction Limiting Unit 1 to 7500 Effective Full Power Hours
ML19312B910
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/30/1974
From:
DUKE POWER CO.
To:
References
Download: ML19312B910 (1)
Forwards Results of Unit 1 Clad Collapse Analysis Per B&W rept,BAW-10084 & Supports three-cycle Operation of Unit 1. Also Forwards Replacement Page 3.11-1 for Tech Specs Deleting Restriction Limiting Unit 1 Operation
ML19312B905
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/30/1974
From: Thies A
DUKE POWER CO.
To: GIAMBUSSO A
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML19312B905 (6)