ML19312B880

From kanterella
Jump to navigation Jump to search
Forwards Proposed Tech Spec 2.1,2.3,3.1.9 & 3.5.2 Re Cycle 3 Operation & B&W rept,BAW-1427, Unit 1 Cycle 3 Reload Rept. Rept Withheld (Ref 10CFR2.790)
ML19312B880
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/01/1975
From: Parker W
DUKE POWER CO.
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML19312B882 List:
References
NUDOCS 7911250074
Download: ML19312B880 (4)


Text

,

~

NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO: d d 20 FILE:

FROM: Duke Power Company DATE OF COC DATE REC'D LTR TWX RPT OTHER Charlotte, NC w o Parker 3r 12-1-75 12-5-75 XXXX

- TO:

ORIG CC OTHER SENTNRC PDR

  • vv Mr Rusche 3 signed SENT LOCAL POR
  • XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXXXXXXXX

' 3 50-269 DESCRIPTION:

ENCLOSURES:

Ltr requesting withholding pursuant to Amdt to OL/ Change to Tech Specs:

Consisting 10 CFR 2.790.... trans the folloying:

. [

o f info concerning Cycle 33 reload..........

g)i,f/.4 4./#h ' e as listed below:

f DENOTES WITHOUT PROP ENCIf&4D)ffj@

1.Attch (1-proposed chances & revised pgs...

  • DELAY IN DISTRIBUTION DUE TO NECES31TY Or
4. Attch 12-Prop sections o f BAW-142 7........

HAVING TO WATT FOR THE ARRIVAL OF 37 CON-3.Attch 13-BAW-1247 entitled "0conee Unit 1

~

FORDED CYS...ADDL CYS REC"D 11-17-75.

Cycle r/3 reload".......

/b

/1/

PLANT NAME: Oconee 11 (40 sets enc 1 rec'd)

FOR ACTION /INFC RMATION 12-13-75 ehf BUTLER (L)

SCHWENCER (L) ZIEMANN (L)

REG AN (E)

REID(L)

W/ Copies W/ Copies W/ Copies W/ Copies W/ COPIES CLARK (L)

STOLZ (L)

DICKER (E)

LEAR (I )

W/ Copies W/ Copies W/ Copies W/ Copies U ~,.

PARR (L)

VASSALLO (L)

KNIGHTON (E)

SPIES

'-v W/ Copies W/ Copies W/ Copies PURPLE (L)*"(gW/ Copies -

KNIEL (L)

YOUNGB LOOD (E)

LPn 7

W/ Copics

/

W/6Copics W/ Copies W/ cop;es INTERNAL DISTRIBUTION QFG FH D /

TECH REVIEW DENTON LIC ASST A/T IND.

A.1C PDR SCHROEDER GRIMES R. DIGGS (L)

BRAITMAN OGC, ROOM P-506A MACCARY GAMMILL H. GEARIN (L)

SALTZMAN GOSSICK/ STAFF KNIGHT KASTNER E. GOULGOURNE (L)

MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E)

GI AM BUSSO SHAO SPANG LER J. LEE (L)

_P_L A NS BOYD STELLO M. RULER 00RL)

MCDONALD MOORE (L)

HOUSTON E N VI R O_.

S. REED (E)

CHAPMAN DEYOUNG (L)

NOVAK MULLER M. SERVICE (L)

DUBE (Ltr)

SKOVHOLT (L)

RCSS DICKER S. SHEPPARD (L)#/C E. COUPE f

GOLLER (L) (Ltr)

IPPO LITO KNIGHTON M. SLATER (E)

PETERSON P. CO L LINS TEDESCO YOUNGBLOOD H. SMITH (L)

HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L)

KLECKER R EG_OP R_ " 2 ",1 LAlN AS PROJECT LOR G. WILLI AMS (E)

EISENHUT

' FILE & REGION (2)

BENAROYA

_H f.@_ESS R. ING R ' M (L)

V. WILSON (L)

WIGGINTC N HIPC VOLLMER

11. DUNC/.N (.n EXTEr<N AL DISTRIEUTION
  1. 1 - LOCAL PDR.ILh I bn //A, $C h-h - TIC (ABERN ATHY)

(1)(2)(10) - NATIONAL LABS 1 - PDR SAN /LA/NY A1 - NS!C (BUCHAN AN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAB 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORNL 1 -- Newton Anderson N EWM AR K/ B LUM E/AG B ASI AN

~.'/

_ / lo - ACRS HOLDINGM s/ I.

  • //- G 6 59 % 50$2p

~

-]

DOCKET NO.

50-269 i

DATE:

December 18, iv75 1

2 NOTE TO Ngc AND/OR LOCAL PUBLIC DOCUMENT ROOMS The following item submitted with letter dated December 1, 1975 from Duke Power Company I

is being withheld from public disclosure, pending review, in accordance with Section 2.790.

PROPRIETARY INFORMATION Tech Specs Change dealing with Cycle r/3 reload 4

l l

1

)

1 l

bb_

8M e

Regulatory File Room 4

4 j

i w

\\

e' DUKE POWER COMPANY Powra Butt.ntxo 422 SocTa Cauncu SrazzT. CaAnt.oTTs N. C. asa4a s.

w s LLI A M O. PA R W E R. J R.

VtC E PW C S. C t re t TELEP**O*eE! AA E4 704

$'tano P2009C*C*e

)

.y 373-4043 December 1, 1975

.6.~

m,,

i W$',

s nr v.

Mr. Benard C. Rusche

- xm,. ~' /

o s

y-H 'l:

O Q

Director of Nuclear Reactor RegulatioEl

(

U. S. Nuclear Regulatory Commission J

DEC-519O"

20555 O

.4

" ff. iyer

. s;'

!- )

-:n e

Re: Oconee Unit 1 N

Ww Docket No. 50-269 O,

Dear Mr. Rusche:

Pursuant to 10 CFR 50 5 50.90, please find attached proposed changes to the Oconee Nuclear Station Technical Specifications.

The purpose of these revisions is to assure operation of the Oconee Unit 1, Cycle 3 core within applicable fuel design and performance criteria. Proposed changes are shown in Attachment 1 as replacement pages for the Oconee Nuclear Station Technical Specifications:

2.1 Safety Limits, Reactor Core 2.5 Limiting Safety System Settings, Protective Instrumentation 3.1.9 Low Power Physics Testing Restrictions 3.5.2 Control Rod Group and Power Distribution Limit Also attached i.: Babcock & Wilcox Report BAW-1427, "Oconee Unit 1 Cycle 3 Reload Report." This report includes a summary of Cycle 3 operating parameters, and contains safety analyses supporting operations of the Oconee 1 Cycle 3 Core at rated power in accordance with the Technical Specifications provided.

Certain data contained on Pages 4-5 and 4-6 have been identified as containing information which the Babcock and Wilcox Company considers to be proprietory and is included as Attachment 2.

Therefore, it is requested that Attachment 2 be withheld frcm public dis-closure pursuant to 10 CFR 2, 5 2.790.

Refueling operations for Oconee Unit 1 are presently scheduled to commence in late January 1976 with power operation resuming in early March 1976.

Accordingly, your prompt review of these proposed revisions is requested.

f Very truly yours,,o i

/

/

g b

LD.

William O. Parker, Jr.

MST:mmb Attachments

., ~

, Mr. Benard C. Ruscha December 1, 1975 Page 2 WILLIAM 0. PARKER, JR., being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendia A to Facility Operating Licenses DPR-38, DPR

.'.7 and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge, p

N

. s.'.

[,

William O. Parker, Jr., Tice President ATTEST:

f Av J

n C. Goodman, Jr. "

sistant Secretary Subscribed and sworn to before me this 1st day of December 1975.

J

=#

Notary Public My Commission Expires:

l

-i

\\