ML19312B805

From kanterella
Jump to navigation Jump to search
Requests Changes to Tech Spec 3.3,incorporating New Tech Spec 3.3.8 Requiring Operability of Three HPI Pumps for Each Unit During Power Operation Above 60% Full Power Per 780414 Ltr.Proposed Tech Spec Encl.Amend Is Class I & III
Date released: 11/22/2019 Download: ML19312B805


Proposed Tech Spec 3.3 Incorporating New Tech Spec 3.3.8 Requiring Operability of Three HPI Pumps for Each Unit During Power Operation Above 60% Full Power
ML19312B809
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/20/1978
From:
DUKE POWER CO.
To:
References
Download: ML19312B809 (2)
Requests Changes to Tech Spec 3.3,incorporating New Tech Spec 3.3.8 Requiring Operability of Three HPI Pumps for Each Unit During Power Operation Above 60% Full Power Per 780414 Ltr.Proposed Tech Spec Encl.Amend Is Class I & III
ML19312B804
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/20/1978
From: Thies A
DUKE POWER CO.
To: CASE E G
Office of Nuclear Reactor Regulation
References
Download: ML19312B804 (3)