U. S. ATUMIC ENERGY COMMISGION REGION 1 DIVISION OF COMPLIA';CE Report of Inspection CO Report Mo. 320/71-2 Licensee:

Metropolitan Edison Company Three Mile Island Unit (Met Ed)

No. 2 License No. CPPR-66 Date of Inspection:

April 5-8, 1971 Date of Previous Inspection:

January 18-19, 1971 Inspected by:

'f [

D. M. Hunnicutt, Reviewed by:

Reactor Inspector (Prinicpal)

-2.//7 /

Date

._4.4M aA M

. M Howard, Senior Reactor Inspector

'h[' /

Proprietary Information:

Date None SCOPE A routine, L'T pressurized water reactorsunannounced inspection was cade of Uni near'Middletown, Pennsylvania. (36W) under construction on Thret No. 2, one of the tw items listed in PI 3800/2 and iappraisal of the perfor=ance of the licThe ncluded an inspection of Attachment Gensee-c oward an Class 1 Piping, for t! a pressurizer the core flooding (accu =ulators) piping. surge line and the spray line piping tanks

- Other and

?QeMAR_Y Safety Items - None Nonconfor:ance Items - None Unusual Occurrences _ - None Other Sienificant Items - None Manace=ent Interview he inspector infor=ed Mr. E. Allen that and spect'fications indicated agreement withthe inspection of the piping pro licensee made no cr_.nents concerning th e inspection findings.co=itments made in the PSAR The 4'JI}

5'8 79OSO3oOf3

2-A.

Persons Contacted Met Ed Mr. Earl Allen, Resident QA Supervisor Mr. Matt J. Stre= berg, Resident QA Supervisor (Replace =ent for Mr. Allen)

Mr. Gene Hrec:uch, Construction Engineer Mr. William Shepard, Resident Mechanical Engineer 3

Construction Status Mr. Shepard estinated that Unit No. 2 was approximately 157, complete, based on manhours expended.

C.

Class I Picing The inspector perforced a review of the QA and QC systems for the pressurizer core flooding tanks (accu =ulators) surge line and spray line piping and for the piping in accordance with Attachment G - Other Class I Piping, PI 3800/2.

The inspection covered items 4805.03, 4805.04.a.1 through and including a.4, 4E05.04 S.2 and b. 3, ' 805.04.c.1 through and including 4805.04.d. 3, 4805.05. f.1 through and inc uding 4805.04.g.3 and 5005.03. The procedures, instructions and specifica-tions are in agreenent with the ec=mitments in the PSAR. No deficiencies or a:issions in procedures or record keeping were observed during the inspection.