UmTED STATES
(
'A'<.
ATOMIC ENERGY COMMISSION d' /b Divis ON OF COMPL.! ANcc 201 645 RCGION I 3
97c DROAD STRCCT NCWARK. NEW JCRSCY 07102 p
MAY l1 E71 J. 3. Henderson, Chief, Reactor Construction 3 ranch, Division of Co=pliance, HQ YETROPOLITAN EDISCN CCPJANY, ~~d'iEE MILE IS L'dD N O. 2 DOCKET NO. 50-320 The enclosed report of the inspection of the Metropolita,a Edison Company, Three Mile Island Unit No. 2 construction site, performs by D. M. Hunnicutt on April 5 through 8, 1971, is forward (d for infor=ation.
ne =ajority of the effort during this inspection was spent on Unit No. 1 due
~~
to the decreased e=phasis on Unit No. 2 by the licensee. The quality con-trol procedures to be used for welding of the pressurizer surge line and spray line piping and the core flooding tank piping were inspected and found adequate.
This facility is approximately 15% co=plete with the progress each conth esti=ated to be approximately 1", per conth at the present time.
The pressure vessel is esti=ated to be 2/3 cc=plete with scheduled delivery late this year, which is approximately a year prior to our earliest estimated date thrt the reactor vessel can be installed.
]Fri.:
E. M. Howard Senior Reactor Inspector
Enclosure:
CO Report No. 320/71-2, by D. M. Hunnicutt dated 4/21/71 cc:
E. G. Case, DRS (3)
?. A. Morris, DRL R. S. 3cyd, DRL (2)
R. C. DeYoung, DRL (2)
D.. J. Skovholt, DRL (3)
P.'W. Howe, DRL (2)
,A.
Gia=busso, CO L. Ic..blith, Jr., CC