CP-201900601 TXX-19093 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 ENERGY
!1'JiTXU I I!
..., energy Luminant 10/31/2019
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NOS. 50-445 AND 50-446 CPNPP UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS & VALVES THIRD INTERVAL, REVISION 3
Dear Sir or Madam:
Brian F. St Louis Plant Manager Lum in ant P.O. Box 1002 6322 North FM 56 Glen Rose, TX 76043 o 254.897.5692 Ref 10 CFR 55a(f)(5)(iii)
Pursuant to 10 CFR 55a(f)(5)(iii), Vistra Operations Company LLC (Vistra OpCo) the operator of Comanche Peak Nuclear Power Plant Units 1 and 2 (herein referred to as CPNPP), herewith submits CPNPP Units 1 and 2 lnservice Testing Plan for Pumps and Valves, Third Interval, Revision 3.
The start date of the third interval of the lnservice Test Plan for CPNPP, Units 1 and 2 is August 3,2013 with an end date of August 2, 2023. Revision 3 was effective October 31, 2019. The enclosed CD-ROM contains the CPNPP Units 1 and 2 lnservice Testing Plan for Pumps and Valves, Third Interval, Revision 3.
This communication contains no new commitments regarding CPNPP Units 1 and 2.
Should you have any questions, please contact Garry Struble at (254) 897-6628 or garry.struble@luminant.com.
TXX-19093 Page 2 of 2 Sincerely, a~
Enclosure:
CPNPP lnservice Test Plan, Third Interval, Revision 3 (CD) c -