CP-201900601, Inservice Testing Plan for Pumps & Valves Third Interval, Revision 3

From kanterella
(Redirected from ML19311C474)
Jump to navigation Jump to search
Inservice Testing Plan for Pumps & Valves Third Interval, Revision 3
ML19311C474
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/31/2019
From: St. Louis B
Luminant, TXU Energy, Vistra Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19311C476 List:
References
CP-201900601, TXX-19093
Download: ML19311C474 (2)


Text

CP-201900601 TXX-19093 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 ENERGY

!1'JiTXU I I!

..., energy Luminant 10/31/2019

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NOS. 50-445 AND 50-446 CPNPP UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS & VALVES THIRD INTERVAL, REVISION 3

Dear Sir or Madam:

Brian F. St Louis Plant Manager Lum in ant P.O. Box 1002 6322 North FM 56 Glen Rose, TX 76043 o 254.897.5692 Ref 10 CFR 55a(f)(5)(iii)

Pursuant to 10 CFR 55a(f)(5)(iii), Vistra Operations Company LLC (Vistra OpCo) the operator of Comanche Peak Nuclear Power Plant Units 1 and 2 (herein referred to as CPNPP), herewith submits CPNPP Units 1 and 2 lnservice Testing Plan for Pumps and Valves, Third Interval, Revision 3.

The start date of the third interval of the lnservice Test Plan for CPNPP, Units 1 and 2 is August 3,2013 with an end date of August 2, 2023. Revision 3 was effective October 31, 2019. The enclosed CD-ROM contains the CPNPP Units 1 and 2 lnservice Testing Plan for Pumps and Valves, Third Interval, Revision 3.

This communication contains no new commitments regarding CPNPP Units 1 and 2.

Should you have any questions, please contact Garry Struble at (254) 897-6628 or garry.struble@luminant.com.

TXX-19093 Page 2 of 2 Sincerely, a~

Enclosure:

CPNPP lnservice Test Plan, Third Interval, Revision 3 (CD) c -