ML19310A577

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-266/80-09 & 50-301/80-08 on 800310-14 & 0408.No Noncompliance Noted
ML19310A577
Person / Time
Site: Point Beach  
Issue date: 05/16/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19310A578 List:
References
NUDOCS 8006200272
Download: ML19310A577 (2)


See also: IR 05000266/1980009

Text

Tl0

,%

.

/

  1. 'o,

UNITED STATES

8\\

"'n

NUCLEAR REGULATORY COMMISSION

$. )

g)g' E

REGION 111

,

e.-

t

799 ROOSEVELT ROAD

' be

e

GLEN ELLYN, ILLINolS 60137

.....

h06

.

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN:

Mr. Sol Burstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the inspection conducted by Mr. J. D. Smith and

Mr. F. W. Reimann of this office on March 10 thur 14,1980 of activities

at Point Beach Nuclear Plant Units 1 and 2 authorized by NRC Operating

License Nos. DPR-24 and DPR-27 and to the discu'ssion of our findings with

Mr. G. A. Reed at the conclusion of the inspection.

This also refers to

the management meeting held between you and members of your staff, with

members of the Region III staff on April 8, 1980 at the Point Beach

Plant.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

80062009,7 1

.

. _._

_ _

.

Wisconsin Electric Power

-2-

Company

dd4Y. 1 6 E60

We will gladly discuss any questions you have concerning this

inspection.

.

-

Sincerely,

- &J

R. F. Heishman, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

IE Inspection

Reports No. 50-266/80-09

and No. 50-301/80-08

-

cc w/ encl:

Mr. G. A. Reed, Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Sandra A. Bast, Lakeshore

Citizens for Safe Energy

Mr. John J. Duffy, Chief

Boiler Inspector

%

'a

4

m

+r

g--

-

m

s.-w--

-1

-s-- - - -