Forwards IE Insp Rept 50-461/80-04 on 800325-28 & Notice of Violation
ML19310A534
Person / Time
Site: Clinton 
Issue date: 04/25/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML19310A535 List:
References
NUDOCS 8006200118
Download: ML19310A534 (2)


See also: IR 05000461/1980004

Text

o

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

$

,E

REGION 111

~#

P

799 HooSEVELT ROAD

g**

GLEN ELLYN, ILLINOIS 60137

.....

APR 2 5 880

Docket No. 50-461

Illinois Power Company

ATTN:

Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the inspection conducted by Messrs. H. M. Wescott,

K. Naidu, and K. Ward of this office on March 25-28, 1980, of activities

at the Clinton Power Station, Unit 1, authorized by NRC Construction

Permit No. CPPR-137 and to the discussion of our findings with

Mr. J. Hampton and others of your staff a?. the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vationt., and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title-10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of

your receipt of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective action taken and

the results achieved; (2) corrective action to be taken to avoid further

noncomplianca; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follows.

If the enclosures contain

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The application must include a full statement of the reasons for which

Booes coIS

.)

_

.

Illinois Power Company

-2-

APR 2 5 560

-

the information is considered proprietary, and should be prepared,so that

proprietary information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

\\

'f)l-

-

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-461/80-04

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office

of Assistant Attorney General