ML19310A317

From kanterella
Jump to navigation Jump to search
Forwards Amend to BAW-1607, Crystal River Unit 3 Cycle 3 Reload Rept, Revision 1.Certificate of Svc Encl
ML19310A317
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/06/1980
From: Baynard P
FLORIDA POWER CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19310A318 List:
References
3--3-A-3, 3-0-3-A-3, NUDOCS 8006110080
Download: ML19310A317 (4)


Text

-

NY i%

  • %31@b;Tly*

sm,w y

M Power CD M 70 m a r som June 6, 1980 File: 3-0-3-a-3 Director Office of Nuclear Reactor Regulation Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72

Dear Sir:

Enclosed are three (3) originals and forty (40) copies of revision to the report BAW-1607 Revision 1, April 1980, Crystal River Unit 3 Cycle 3 Reload Report. This report was submitted on April 14, 1980 and justifies opera-tion of Crystal River Unit 3 at 2544 MWt. These revisions are required due to the replacement of a fuel assembly which was found to have a broken holddown spring. The accident and transient analysis presented in BAW-1607 continue to be conservative with respect to continued operation at the cur-rent licensed power level of 2452 MWt. Proposed Technical Specifications for continued operation at 2452 MWt without Reactor Coolant Pump Power Monitors were. submitted on April 30, 1980. These Technical Specifications are based on the analysis in BAW-1607. The Technical Specifications submitted on Arril 30, 1980 remain unchanged due to these revisions to BAW-1607.

A written response to other questions by membe.s of your staff concerning the analysis in BAW-1607 will be provided by 6/13/80.

9 8 00 611 OMO General Office 3201 inirty-fourtn street soutn . F O. Box 14042. St Petersburg, Fionda 33733 e 813-866-5151

irector Page Two June 6, 1980 Please advise if further discussion is required.

Sincerely, FLORIDA POWER CORPORATION P.9 $

Y. Baynard 4 W ,

Manager Nuclear Support Services.

Enclosures PYBhewF05D3 cc: Director-

_ Office of Inspection and Enforcement U.S. Nuclear Regulatory. Commission

' Suite 3100 101 Marietta Street-Atlanta, GA 30303 v

a 4

3 g e.

STATE OF FLORIDA COUNTY OF PINELLAS P. Y. Baynard states that she is the Manager, Nuclear Support Services of Florida Power Corporation; that she is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of her knowledge, information and belief.

nM- Mnd F. T. Bafnfrd Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 6th de of June,1980.

.t Notarf Public Notary Public, State of Florida at' Large, My Commission Expires: August 24, 1983 CrockettNotary (012).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION IN THE MATTER OF D0CKET N0. 50-302 FLORIDA POWER CORPORATION )

CERTIFICATE OF SERVICE P. Y. Baynard deposes and says that the following has been served on the Chief Executive of Citrus County, Florida by deposit in the United States mail, addressed as follows:

Chairman, Board of County Commissioners of Citrus County Citrus County Courthouse Inverness, Florida 32650 An original copy cf Revisions to Reload Report BAW-1607 i

FLORIDA POWER CORPORATION w 7 h, M w '

f. Y.4affiard '

Manager Nuclear Support Services SWORN TO AND SUBSCRIBED BEFORE ME THIS 6th DAY OF JUNE, 1980.

otary Public i Notary Public State of Florida at Large My Commission expires: August 24, 1983 (NOTARIAL SEAL) l

-(Cert. Serv.012)

_ . _ -..