ML19310A091

From kanterella
Jump to navigation Jump to search
Forwards Revision 2A for Consolidated SAR for IF-300 Shipping Cask, Vol 1.Revision Incorporates High Pressure Fuel Rod Accident Analysis for Dry Casks Shipping Mode
ML19310A091
Person / Time
Site: 07109001
Issue date: 04/30/1980
From:
GENERAL ELECTRIC CO.
To:
Shared Package
ML19310A089 List:
References
16333, NEDO-10084-2, NEDO-10084-2-V1-R2A, NUDOCS 8006060074
Download: ML19310A091 (9)


Text

,.

t e

e

!!o 1

I

+

1

(

I i

i 1

L 1

I The following material is to be j

inserted in Volume I of I

NEDO-10084-2, "IF-300 Consolidated Safety Analysis Report" 4

i j

i i

i

'5 1

4 i

l i

i e

i 4

4 1

i i

i i

I s.

f-1 800606007[

NEDO-10084-2 April 1980 Consolidated Safety Analysis Report for IF 300 Shipping Cask REVISION INDEX for pri 980 Revision 2A incorporates ?igh pressure fuel rod accident analysis for dry cask shipping mode.

Pages to be Removed Pages to be Inserted Chapter Page No.

Date Chapter Page No.

Date Volume I Title page 10/79 Legal Notice 10/79 Revision Summary 4/80 Table of Contents lii,1v, v/vi 4/80 Volume II Volume II Title page 10/79 Legal Notice 10/79 Revision Summary 4/80 Table of Contents iii,1v, v/v1 4/80 Table of Contents 6-1,6-11 10/79 Table of Contents 6-1,6-11 4/80 List of List of Illustrations 6-iii,6-iv 10/79 Illustrations 6-iii,6-iv 4/80 List of Tables 6-v,6-vi 10/79 List of Tables 6-v,6-vi 4/80 Chapter 6 6-13,6-14, Chapter 6 6-13,6-14, 6-15,6-16 10/79 6-15,6-16 4/80 6-19,6-20 10/79 6-19,6-20 4/80 6-85,6-86 10/79 6-85,6-86 4/80 6-91,6-92 10/79 6-91,6-91a through 6-91j,6-92 4/80 6-113 through 6-113 through 6-118 10/79 6-118b 4/80 1 of 2

NEDO-10084-2 April 1980 REVISION 2A (CONTINUED)

Pages to be Removed Pages to be Inserted Chapter Page No.

Da'te Chapter Page No.

Date Volume II Volume II Chapter 6 Chapter 6 6-123, 6-123, 6-124, 6-124, 6-125, 6-125, 6-126 10/79 6-126 4/80 6-169, 6-169, 6-170 10/79 6-170 4/80 Chapter 11 Chapter 11 11-5,11-6 10/79 11-5,11-6 4/80 C

e f

D e

g O

M

)

2 of 2

l OCTOBER 19 9 i

i IF 300 I

SHIPPING CASK CONSOLIDATED SAFETY ANALYSIS REPORT i

VOLUMEl 1

I NUCLEAR FUEL & SERVICES DIVISION GENERAL @ ELECTRIC

~

\\

DISCLAIMER OF RESPONSIBILITY Thrs document was prepared by or for the General Electric Company. Neither me General Elecmc Company not any of the contnbutors to this document:

A.

Makes any warranty or representation, express or implied, with respect to the accuracy, completeness, or usefulness of me informadon containea in mis dccu.

ment. or that the, use of any informadon disclosed in this document may not ininnge pnvately owned nghts; or B.

Assumes any responsibility for liability or damage of any kind which may result from me use of anyinformadon disclosed in this document.

l h

a

NEDO-10084-2 1

April 1980 f

CONSOLIDATED SAFETY ANALYSIS REPORT FOR IF 300 SHIPPING CASK Revision and Amendment Date Summarv NEDO-10084-2 10/79 Consolidation of previous licensing documentation.

NEDO-10084-2A 4/80 Incorporation of high pressure fuel rod accident analysis for dry cask shipping mode.

REVISION CODING KEY: New or changed information is indicated by vertical bars in the richt margin opposite the new or changed information:

"N" indicates new information; "E" indicates editorial changes or corrections.

DOCUMENT NUMBER KEY:

NEDO-10084-2 A

/erialj Revision Prefix S

- Document Series

U f

NEDO-10084-2 April 1980 TABLE OF CONTENTS P, age, I.

INTRODUCTION 1-1 II.

DESIGN

SUMMARY

2-1 2.1 Cask Description 2-1 2.2 Structural Analysis 2-4 2.3 Thermal Analysis 2-8 2.4 Criticality Analysis 2-12 2.5 Shielding Analysis 2-13 2.6 Fission Product Release 2-16 2.7 Regulations 2-17 2.8 Operating and Maintenance 2-17 2.9 Fabrication and Quality Assurance 2-18 III.

FUELS AND CONTENTS DESCRIPTION 3-1 3.1 Fission Product Activities and Powers for the Design Basis Fuels 3-1 3.2 Axial Peaking Factor 3-9 3.3 Fission Product Generation 3-9 3.4 Fuel Acceptance 3-9 3.5 Defective Fuel 3-13 3.6 Non-Fuel Contents 3-17 IV.

EQUIPMENT DESCRIPTION 4-1 4.1 Shipping Package 4-1 4.2 Cask Lifting Yokes 4-10 a

4.3 Alarm System 4-11 4.4 Intermodal Transportation -- Information only 4-11 V.

STRUCTURAL INTEGRITY ANALYSIS 5-1 5.1 Introduction 5-1 5.2 Design Loads 5-1 5.3 Materials 5-3 5.4 Vessel Design Stress Analysis 5-10 5.5 30-Fcot Drop -- Energy Absorption and Deceleration 5-28 5.6 30-Foor Drop - Component Stresses 5-49 i

l 111 l

NEDO-10084-2 April 1980 TABLE OF CONTENTS (Continued)

P,,ag 5.7 40-Inch Drop Puncture 5-195 5.8 Cask Tiedown and Lifting 5-203 5.9 Engagement of Cask and Tiedowns 5 ',78 5.10 Corrugated Exterior Water Containment 5-280 5.11 Cask Lif ting Yoke -- Standard 5-286 5.12 Cask Reliability Under Normal Conditions of Transport 5-298 5.13 Section Conclusion 5-339 5.14 References 5-339 Appendix V-1: NEDO-21746 5-344 VI.

THERMAL ANALYSIS 6-1 6.1 Introduction 6-1 6.2 Summary of Thermal Analyses 6-4 6.3 Procedures and Calculations 6-20

)'

6.4 Cooling System Sizing 6-118a 6.5 Cavity Relief Valve 6-124 6.6 Other Cask Valves 6-141 6.7 Con'firmation of Cask Thermal Performance 6-149

.i 6.8 Decay Heat Limits 6-165 6.9 Section Conclusions 5-166 6.10 References 6-168 Appendix VI-1:

IF-300 Shipping Cask Demonstration Testing Report, Cask #301 6-171 VII.

CRITICALITY ANALYSIS 7-1 7.1 Introduction 7-1 7.2 Fuel Description 7-1 7.3 Summary and Conclusions 7-5 7.4 Cross-Section Dimensions 7-8 7.5 Cask Calculation 7-21 7.6 Effects of Cladding Thickness and Material 7-26 7.7 14 x 14 Rod Array Bundles 7-28 7.8 Infinite Array of Casks 7-28

))

iv

NEDO-10084-2 April 1980 TAPLE OF CONTENTS (Continued) l P_ age 7.9 Effects of U-235 in the Shield 7-30 7.10 Reflection from Heavy Metal Shielding -

7-30 7.11 Dry Cask Shipping (Air-Filled Cavity) 7-30 VIII.

SHIELDING 8-1 8.1 Fuel Bases and Source Terms 8-1 8.2 Shielding Methodology 8-6 8.3 Internal Shielding 8-20 8.4 Air-Filled Cavity 8-20 8.5 Dose-Rate Acceptance Criteria 8-20 IX.

CALCULATED FUEL ROD PERFORATION TDTERATURES i

FISSION GAS RELEASE AND TOTAL CASK ACTIVITY 9-1 9.1 Introduction 9-1 9.2 Fission Gas Generation 9-1 9.3 Fission Gas Release and Fuel Pin Pressures 9-8 9.4 Fuel Rod Perforation 9-17 9.5 IF 300 Cask Inventory 9-20 9.6 IF 300 Cask Fission Gas Release -- PWR Configuration 9-20 9.7 Cask Coolant Activity and Total Releases 9-32 l

9.8 Fuel Rod Pressure Considerations 9-36 9.9 Section conclusion

  • 9-37 X.

SAFETY COMPLIANCE 10-1 10.1 Introduction 10-1 10.2 10CFR71 10-1 10.3 49CFR173 10-4 10.4 Section Guide 10-5 II.

QUALITY ASSURANCE AND TESTING 11-1 11.1 Introduction 11-1 11.2 Quality Assurance Plan 11-1 11.3 Testing 11-5 Appendix XI-1: QA Plan Swamary 11-9 Appendix XI-2: Questions and Responses 11-10 v/v1