Forwards LER 80-036/03L-0
Date released: 11/19/2019 Download: ML19309H937


LER 80-036/03L-0:on 800418,main Turbine Control Valve Fast Closure Test Failed to Meet Required Response Time.Caused by Slow Actuation Time on Installed Switch.Switch Replaced