ML19309H524

From kanterella
Jump to navigation Jump to search

Forwards End-of-Cycle 1 Onsite Fuel Assembly Observations, Re Nuclear Fuel Assembly Insp Surveillance Program
ML19309H524
Person / Time
Site: Beaver Valley
Issue date: 05/08/1980
From: Dunn C
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML19309H525 List:
References
TAC-8595, NUDOCS 8005130458
Download: ML19309H524 (1)


Text

-

k US

' abs M

gm casco

=::.-

May 8, 1980 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Coc: mission Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Nuclear Fuel Assembly Surveillance Program Gentlenan:

Attached hereto is a preliminary report of the 17 x 17 fuel inspection conducted during the Cycle 1 - Cycle 2 refueling of Beaver Vallay Power Station, Unit No. 1.

This written report is submitted in lieu of the verbal report which we agreed to provide by my letter of April 11, 1977. A final report of the fuel inspection program will be forwarded for your information upon completion.

Very truly yours, Oyb C. N. Dunn Vice President, Operations Attachment cc:

Mr. D. A. Beckman, Resident Inspector United States Nuclear Regulatory Coc: mission Beaver Valley Power Station Shippingport, PA 15077 00l

///