g 0051SO APPENDIX A NOTICE OF VIOLATION Combustion Engineering Incorporated Docket No. 70-1100 This refers to the inspection conducted by representatives of Region I (Philadelphia) office at the Combustion Engineering Incorporation, Windsor Connecticut of activities authorized by NRC License No. SNM-1067.
During the inspection conducted on February 12-13, 26-28, 1980, one apparent item of noncompliance was identified, 10 CFR 70.51(e)(4)(1) " Material balance, inventory and record requirements" states in part... "Within 30 calendar days after the start of each ending physical inventory required by paragraph (e)(3) of this section:
(1) Calculate, for the material balance interval terminated by that inventory, the material unaccounted for (MUF) and its associated limit of error for each element and the fissile isotope for uranium contained in material in process..."
Contary to the above, on February 12, 1980, the inspector determined that the licensee had not calculated the material unaccounted for (MUF) for the December 13, 1979 low enriched uranium physical inventory within 30 days of the start of the physical inventory.
This is an infraction.