0 0 05 0 9 0$tt A

OPERATING DATA REPORT DOCKET NO. 50-255 DATE May 2.1980 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 OPERATING STATUS Palisades Notes

1. Unit Name:

800401 - 800430

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2530 811.7

4. Nameplate Rating (Gross MWe):

805

5. Design Electrical Rating (Net MWe):
  • 675
6. Maximum Dependable Capacity (Gross MWe):
  • 635
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Level To which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to.Date Cumulative 720 2904 73.335 II. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 0

0 39,564.8

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 0

0 37.426.3

15. Unit Reserve Shutdown Hours 0

0 71,511,480

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 0

22,032,230 0

0 20.670.775

18. Net Electrical Energy Generated (MWH) i
19. Unit Service Factor 0

0 51.0 0

0 51.0

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 0 0

44.4 0

0 35.0

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

0 36.3 j

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eachl.
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

May 15, 1980

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Based on Condenser Backpressure (9/77)

AVERAGE DAILY UNIT POWER LEVP DOCKET NO. 50-255 UNIT Palisades DATE 5/2/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONT11 April 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

0 g7 2

0 gg 0

0 3

0 39 0

4 20 0

5 0

0 21 0

6 22 0

t 7

0 23 0

0 8

24 0

9 0

0 25 0

10 26 0

11 0

27 0

0 0

12 28 13 0

29 0

14 0

30 0

0 15 3

16 0

INSTRUCTIONS On this format.hst the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) i I

A e

UNIT SliUIDOWNS AND FO,WER REDUCTIONS DOCKET NO.

50-255 UNIT NAME Palisades DATE 5/2/80 REPORT MONTil April 1980 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 E

~

.$ ?

"g j.E 3 1.icensee

[cg je.

Cause & Corrective No.

Date i

?

j 2 ~E Event g

3

~?

gV Action to

$~

c2 35e Report 2r mO o

Prevent Recurrence u

c5 13 800401 S

720 H

TMI Modifications and anchor bolt (Contd; inspections / repairs according to IE Bulletin 79-02.

l 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructiins S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Man ual Scra m.

Entry Sheets for Licensee C. Refueling 3-Automatic Scram.

Event Report (LE R) File (NUREG.

D Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77) 11-01her (Explain)

l

SUMMARY

OF OPERATING EXPERIENCE FOR APRIL 1980 1

GENERAL Work continues on the seismic pipe hanger / anchor bolts inspections and repairs, and TMI modifications. Heatup is expected to commence the early part of May.