OPERATING DATA REPORT DOCKET NO. 50-255 DATE May 2.1980 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 OPERATING STATUS Palisades Notes
- 1. Unit Name:
800401 - 800430
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2530 811.7
- 4. Nameplate Rating (Gross MWe):
805
- 5. Design Electrical Rating (Net MWe):
- 675
- 6. Maximum Dependable Capacity (Gross MWe):
- 635
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Date Cumulative 720 2904 73.335 II. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
0 39,564.8
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 0
0 37.426.3
- 15. Unit Reserve Shutdown Hours 0
0 71,511,480
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 0 0
22,032,230 0
0 20.670.775
- 18. Net Electrical Energy Generated (MWH) i
- 19. Unit Service Factor 0
0 51.0 0
0 51.0
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 0 0
44.4 0
0 35.0
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
0 36.3 j
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eachl.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
May 15, 1980
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on Condenser Backpressure (9/77)
AVERAGE DAILY UNIT POWER LEVP DOCKET NO. 50-255 UNIT Palisades DATE 5/2/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONT11 April 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
0 g7 2
0 gg 0
0 3
0 39 0
4 20 0
5 0
0 21 0
6 22 0
t 7
0 23 0
0 8
24 0
9 0
0 25 0
10 26 0
11 0
27 0
0 0
12 28 13 0
29 0
14 0
30 0
0 15 3
16 0
INSTRUCTIONS On this format.hst the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) i I
A e
UNIT SliUIDOWNS AND FO,WER REDUCTIONS DOCKET NO.
50-255 UNIT NAME Palisades DATE 5/2/80 REPORT MONTil April 1980 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 E
~
.$ ?
"g j.E 3 1.icensee
[cg je.
Cause & Corrective No.
Date i
?
j 2 ~E Event g
3
~?
gV Action to
$~
c2 35e Report 2r mO o
Prevent Recurrence u
c5 13 800401 S
720 H
TMI Modifications and anchor bolt (Contd; inspections / repairs according to IE Bulletin 79-02.
l 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructiins S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Man ual Scra m.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Event Report (LE R) File (NUREG.
D Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77) 11-01her (Explain)
l
SUMMARY
OF OPERATING EXPERIENCE FOR APRIL 1980 1
GENERAL Work continues on the seismic pipe hanger / anchor bolts inspections and repairs, and TMI modifications. Heatup is expected to commence the early part of May.
i I
1 f
i e
i l
l 1
.-