ML19309H199

From kanterella
Jump to navigation Jump to search
Forwards LER 80-051/03L-0
Date released: 11/19/2019 Download: ML19309H199


LER 80-051/03L-0:on 800409,while Shutdown for Surveillance/ Vent Header Deflector Installation Outage,Dirty Radwaste Discharge Isolation Valve 2G11-F004 Found Leaking in Excess of Spec.Caused by Improper Sealing of Valve Gate
ML19309H201
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/30/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309H201 (2)
Forwards LER 80-051/03L-0
ML19309H198
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/30/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309H198 (1)