Text
._
.
..
.
9
'
"* %
8 0 05 0 70 76CP ACr
'
'
%
UNITED STATES
g
8
NUCLEAR REGULATORY COMMISSION
d ' M,f
o
5
E
REGION 11
NY
o
101 MARIETTA ST., N.W., SulTE 3100
o
ATLANTA, GEORGIA 30303
MAR 2 41980
In Reply Refer To:
RII:WHM
50-348/80-03
50-364/80-03
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This rc ers to the inspection conducted by W. H. Miller, Jr. , of this office on
r
February 26-29, 1980 of activities authorized by NRC License No. NPF-2 and
Construction Permit No. CPPR-86 for the Farley facility, and to the discussion
of our findings held with W. G. Hairston, III at the conclusion of the inspection.
Areas examined during the inspection and our findings
are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
'
-mation identified in the application is contained in a separate part of the
-
-
document.
If we do not hear from you in this regard within the specified period,
..
the report will be placed in the Public Document Room.
.
~
\\
.
. .
9
-
-
-
- - - - - -
.
. .-- .--..
.. - . . . . . . . . .
.-
, .
Alabama Power Company
-2 _
. _ _
.
MAR 24 ngo
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
I
a a
C. E. Nu
y,
hief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-348/80-03
and 50-364/80-03
cc w/ encl:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
R. P. Mcdonald
Vice President-Nuclear Generation
Post Office Box 2641
Birmingham, AL 35291
H. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
,
-J. R. Campbell
Manager-Operations Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
~ Drawer 470
'
~
e'
Ashford, AL 36312
W. C. Petty
Manager-Quality Assurance (Design and Construction)
Post Office Box 2641
Birmingham, AL 35291
'
R. E. Hollands, Jr.
.
QA Supervisor
P. O. Box U
,,
_
'