Forwards IE Insp Rept 50-348/80-03 & 50-364/80-03 on 800226-29.No Noncompliance Noted
ML19309G900
Person / Time
Site: Farley  
Issue date: 03/24/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19309G901 List:
References
NUDOCS 8005070750
Download: ML19309G900 (2)


See also: IR 05000348/1980003

Text

._

.

..

.

9

'

"* %

8 0 05 0 70 76CP ACr

'

'

%

UNITED STATES

g

8

NUCLEAR REGULATORY COMMISSION

d ' M,f

o

5

E

REGION 11

NY

o

101 MARIETTA ST., N.W., SulTE 3100

o

ATLANTA, GEORGIA 30303

MAR 2 41980

In Reply Refer To:

RII:WHM

50-348/80-03

50-364/80-03

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This rc ers to the inspection conducted by W. H. Miller, Jr. , of this office on

r

February 26-29, 1980 of activities authorized by NRC License No. NPF-2 and

Construction Permit No. CPPR-86 for the Farley facility, and to the discussion

of our findings held with W. G. Hairston, III at the conclusion of the inspection.

Areas examined during the inspection and our findings

are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

'

-mation identified in the application is contained in a separate part of the

-

-

document.

If we do not hear from you in this regard within the specified period,

..

the report will be placed in the Public Document Room.

.

~

\\

.

. .

9

-

-

-

- - - - - -

.

. .-- .--..

.. - . . . . . . . . .

.-

, .

Alabama Power Company

-2 _

. _ _

.

MAR 24 ngo

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

I

a a

C. E. Nu

y,

hief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-348/80-03

and 50-364/80-03

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

R. P. Mcdonald

Vice President-Nuclear Generation

Post Office Box 2641

Birmingham, AL 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

,

-J. R. Campbell

Manager-Operations Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

~ Drawer 470

'

~

e'

Ashford, AL 36312

W. C. Petty

Manager-Quality Assurance (Design and Construction)

Post Office Box 2641

Birmingham, AL 35291

'

R. E. Hollands, Jr.

.

QA Supervisor

P. O. Box U

,,

_

'

Ashford, AL 36312

.

.