Forwards IE Insp Rept 50-498/80-01 & 50-499/80-01 During Dec 1979 & Jan-Feb 1980 & Notice of Violation
ML19309G878
Person / Time
Site: South Texas  
Issue date: 03/25/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19309G879 List:
References
NUDOCS 8005070723
Download: ML19309G878 (2)


See also: IR 05000498/1980001

Text

7sC-

~

.? **Nw%

UNITED STATES

NUCLEAR REGULATORY COMMISSION

O\\

r ' ,$

REGloN IV

N

7

E

71

  • i g, .

,

j

611 RY AN PLAZA DRIVE, SUITE 1000

H05 070 /

7

'

g

ARLINGTON, TEXAS 76012

{

-

5,,

A

f

' %. .o '

....."q

March 25, 1980

In Reply Refer to:

RIV

Docket No. 50-498/Rpt.

80-01

1

50-499/Rpt. 80-01

Houston Lighting and Power Company

Attn: Mr. E. A. Turner, Vice President

Power Plant Construction and

Technical Services

Post Office Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by our Resident Inspector, Mr. H. S.

Phillips, during the period of December 1979 and January - February 1980, of

activities authorized by NRC Construction Permits No. CPPR-128 and 129 for the

South Texas Project,11 nits No.1 and 2, and to the discussion of our findings

with Mr. L. D. Wilson and other members of your staff during the inspection

,

period.

j

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulations,

" Quality Assurance Criteria for Nuclear Power Plants." The item of noncompliance

and references to the pertinent requirements reported in paragraph 4.b of the

enclosed inspection report are identified in the enclosed Notice of Violation.

The Notice of Violation for the item of noncompliance reported in paragraph

l

4.a of the enclosed inspection report was forwarded to you by our letter dated

February 13, 1980; therefore, this letter does not require further response

regarding this matter.

Two new unresolved items ara identified in paragraph 4.c of the enclosed report.

This notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 30 days of your

receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid. further noncompliance; and

(3) the date when full compliance will be achieved.

-

.

. _ _

- _ - .

. - - _ _ _

____

.

Houston Lighting and Power Company

2

March 25, 1980

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

j

Title 10, Code of b deral Regulations, a copy of this letter and the enclosed

inspection repec* will be placed in the NRC's PuhHe Document Room.

If the

report contains any information that yo;: believe to be proprietary, it is

j

necessary '. hat you submit a written application ta chie ,ffice, within 20 lays

of the de ce of this letter, requesting that suc' information be withheld from

1

public t'.isclosure. The application mst inclusa a full statement of the reasons

11y it is claimed that the informatloa is proprietary. The application should

4

Le prepared so that any proprietary information identified is contained in an

,

enclosure to the application, since the application without the enclosure will

also be placed in

  • Public Document Room.

If we do not hear from you in this

regard within the s,,ecified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be ,, leased

'

to discuss them with you.

Sincerely,

. _ -

W. C. Seidle, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

IE Inspection Report No. 50-498/80 01

50-499/80-01