G*ou 800 07o 3q ig UNITED STATES 5
e NUCLEAR REGULATORY COMMISSION o
I REGION I
\\ *'****((
631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19408 DocketNos.g-h7 ifM 5!!60 Consolidated Edison Company of New York, Inc.
ATTN: Mr. W. J. Cahill, Jr.
Vice President 4 Irving Place New York, New York 10003 Gentlemen :
Subject:
Inspection No. 15000039/79-07A This refers to an unannounced inspection conducted by R. L. Woodruff and W. W.
Peery of our Region II office on December 12-13, 1979. A shipment of radioactive waste shipped from your facility was inspected upon arrival at the Chem-Nuclear Systems, Inc., Barnwell, South Carolina disposal site.
Areas examined during tne inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of a review of the shipping papers, placarding and labeling requiremants, radiation measurements, selective contamination surveys,and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's, Public Occument Room.
If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, e
Geo ge H. Smith, Chief Fu 1 Facility and Materials 1
afety Branch j
Enclosure:
Inspection Report No. 15000039/79-07A
Consolidated Edison Company of New York, Inc.
2 MAR 51980 cc (w/ encl):
L. O. Brooks, Project Manager, IP Nuclear W. Monti, Manager - Nuclear Power Generation Department M. Shatkouski, Plant Manager J. M. Makepeace, Director, Technical Engineering W. D. Hamlin, Assistant to Resident Manager J. D. Block, Esquire, Executive Vice President - Administration Joyce P. Davis, Esquire l
-