8005070 7@
O 94UPPS Stenderdised Nucteer Unit Power Pfent System 5 Choke Cherry Road Nicholas A. Petrick vi tend 20050 Executige Director March 20,1980 SLNRC 80- 12 FILE: 0491.10.2 SUBJ:
Undetectable Failure in Engineered g3 ety Features Actuation System f
Mr. Boyce Grier Director, Regica I U.S. Nuclear Rt.gulatory Commission 631 Park Avenua King of Prussia, Pennsylvania 19406 Docket Nos.: STN 50-482, STh 50-483, STN 50-485, STN 50-486
Reference:
(1) SLNRC 79-21, dated 12/6/79: Same subject (2) Westinghouse letter (T.M. Anderson), NS-TMA-2204, to USNRC (V. Stello, Jr.), dated 2/15/80:
Same subject
Dear Mr. Grier:
Reference (1) reported a potential deficiency involving the Engineered Safety Features Actuation System and described a test sequence that was the necessary corrective action applicable to the SNUPPS plants.
Ref-erence (2) provided the NRC with revised tests that yield more conclusive results.
The SNUPPS utilities are investigating hardware changes that may preclude the need for the tests described in Reference (2).
If such hardware changes are not feasible, the appropriate test sequence from Reference (2) will be incorporated in the procedures for the SNUPPS plants.
Very truly yt ers,
-C4fW Nicholas A. Petrick RLS/vas cc: