ML19309G625
| ML19309G625 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/21/1980 |
| From: | Bartlett J NIAGARA MOHAWK POWER CORP. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-80-03, IEB-80-3, NUDOCS 8005070253 | |
| Download: ML19309G625 (1) | |
Text
r-
- 73Sc 800507u2a53 N Li h4()ti/LVVl(
Y NIAGARA q
f NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.12"32/TELEPHONF (3'5) 4741511 March 21, 1980 Office of Inspection and Enforcement i
Region I Attention:
Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 d
Dear Mr. Crier:
Re: Nine Mile Point Unit 2 Docket No. 50-410 Your February 6, 1980 I.E.Bulletin 80-03 requested Niagara Mohawk to visually inspect charcoal adsorber cells for leak:ge or loss of charcoal. The charcoal adsorber cells for Nine Mile Point U:.it 2 have not been received on site. These cells will be manufactured by tne Mine Safety Appliances Company. Their design will utilize spot weiding every 3/4 inch to prevent the loss of charcoal from adsorber cells.
Ver:r truly yones, NI/.CARA M0 HAWK POWER CORPORATION
(
% 7//L pn ce-t aw l
James Bartlett Executive Vice President,
PEF:jk xc: Director Division of Fuel Facility and Materials Safety Inspection Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- 1
_