ML19309G622

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-409/79-23 on 791210-14.Noncompliance Noted: Training Not Conducted in Accordance W/Security Plan Commitments & Required Security Equipment Not Utilized. Details Withheld (Ref 10CFR2.790)
ML19309G622
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/03/1980
From: Christoffer G, Hind J, Schwan C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19309G618 List:
References
50-409-79-23, NUDOCS 8005070243
Download: ML19309G622 (2)


See also: IR 05000409/1979023

Text

l

.

.

0

8 n o n 242

>

a

l

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-409/79-23

Docket No. 50-409

License No. DPR-45

Licensee: Dairyland Power Cooperative

2615 East Avenue - South

Lacrosse, WI 54601

Facility Name:

Lacrosse Boiling Water Reactor (LACBWR)

Inspection At: Genoa, WI

Inspection Conducted: December 10-14, 1979

Date of Last Physical Security Inspection: June 21-22, 1979

Type of Inspection: Routine, unannounced, physical protection

N .)N h / o f E

Inspectors:

'G. M. Christof fer

J/y[E

(Physical Security Specialist)

Date

- f.

.D.

C. A. Schwan b

3 f 3!f3

(Inspection (ssistant)

Date

'

}.A. Hind,Chiffb

3!3[J"4

fu

Approved by:

Safeguards Branct()

~ Date

Inspection Summary

Areas Inspected:

Included a review of Security Plan; Security Program

Audit; Security Organization; Protected Area Physical Barriers; Vital

Area Physical Barriers; Lighting Access Control (Identification, Authori-

zation and Badging); Access Control (Search); Access Contrd (Escorting);

Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment

Aids; Communications; Testing and Maintenance; Compensatory Measures;

Power Supply; Response; Locks, Keys, and Combinations; Records and Reports;

Followup on Previous Items of Noncompliance; Followup on IE Bulletin No. 79-16.

The inspectie4 involved 94 inspector hours onsite by 2 NRC inspectors.

l

The inspection began during the day shift; 24 inspection hours were

l

accomplished during offshift periods.

l

l

.

.

.

Results: The licensee was found to be in compliance with NRC requirements

within the 22 areas examined during this inspection except for the following

4 items:

1.

Security Organization: Training was not conducted in accordance

with security plan commitments.

(Infraction)

2.

Security Organization: Required security equipment was not being

utilized.

(Deficiency)

3.

Access Control (Identification, Authorization and Badging): The li-

censee failed to properly control pictured identification badges.

(Deficiency)

4.

Access Control (Search): The licensee failed to properly control

access.

(Deficiency)

Two Unresolved Items were identified. These items will be referred to

NRC Headquarters for eva'.'tation and resolution.

1.

The licensee relocated an assessment aid.

2.

The licensee did not follow a security plan commitment concerr.ing

the protaction of one central communication system.

.

.

S-r3

$0-/I

Copy

of

c: pies

,

l

Fager.

-2-

. ::a 0:C'J'!:*7 !G ::07 T O E

.;J
1.FD '*ITHOUT SPICITIO

i

l

..: : :

"7.---

'