ML19309G543

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Written Response Required
ML19309G543
Person / Time
Site: Marble Hill
Issue date: 04/17/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 8005070126
Download: ML19309G543 (1)


Text

/

UNITED STATES 8" 3 NUCLEAR REGULATORY COMMISSION

[fC

,a REGION lli g*****,e,[

e 0

799 ROOSEVELT ROAD 800 070/ 2 6 5

GLEN ELLYN, ILLINOIS 80137 Docket No. 50-546 APfl 171980 Docket No. 50-547 Public Service of Indiana ATTN:

Mr. S. W. Shields Vice President - Electric System 1000 East Main Street Plainfield, IN 46168 Gentlemen:

The enclosed Bulletin 80-09 is forwarded to you for action. A written response is required.

If yau require additional information refsrding this matter, please contact this office.

Sincerely, JL o.29 ames G. Keppler Director

Enclosure:

IE Bulletin No. 80-09 cc w/ encl:

Mr. Steve J. Brewer, Nuclear Safety and Licensing Supervisor Central Files Director, NRR/DPM Director, NRR/ DOR PDR t

Local PDR NSIC TIC LeBoeuf, Lamb, Leiby & MacRae Mr. Dave Martin, Office of the Attorney General Mr. John R. Galloway, Staff Director, Environment, Energy

.and Natural Resources Subcommittee

_ _ ~ - -...

2 SSINS No. 6820 UNITED STATES Accession No.:

NUCLEAR REGULATORY COMMISSION

,8002280659 OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 il3 "5

m_

April 17, 1980 J*

'8 IE Bulletin No. 80-09 HYPRAM0 TOR ACTUATOR DEFICIENCIES IIT General Controls (ITT-GC) reported to the NRC two (2) problem areas pertaining to their Models AH-90 and NH-90 Series Hydramotor Actuators.

The

)

Nff-90 designators depicts nuclear class 1E d3 sign.

Either of the problems reported could affect the operation of safety related equipment installed in nuclear power facilities:

A.

Or, December 7, 1979, ITT-GC reported the use of springs having incorrect material installed in Models AH-90 and hH-90 Series Hydramotor Actuators.

Inst.ead of 5160 steel, type 1060-1070 steel was used for the No. 1 1

springs in the actuators.

The incorrect spring material does not meet the design strength and upon actuation of greater than 3 inches stroke, a i

permanent set occurs resulting in a decreased force output of up to 160 lbs, depending on spring combinations used and specific adjustments made to the actuators.

About 368 defective springs were used between September 1975 and January 1978.

B.

On February 5,1980, ITT-GC reported that the ITT-GC " Selection Nomograph" for AH-90 and NH-90 series hydramotor actuators represent the actual spring or hydraulic forces only and do not include the effects of friction or residual hydraulic forces.

It has been fetermined that the actuators can have about 100 lbs, of friction and an additional 40 lbs.

of residual hydraulic pressure.

Use of these nomographs may result in 1

j selection of actuators undersized for the use intended.

C.

Action to be taken by licensees and construction permit holders 1.

Each licensee and each holder of a construction permit should determine whether any safety related system or component in the facility uses an AH.-90 or NH-90 series Hydramotor Actuator manu-factured by ITT General Controls.

(Note: To assist in this deter-mination a listing of customers that have purchased said actuators and the number of actuators purchased is appended hereto as Attachment No. 1.

Since some of the Original Equ'tarent Manufac-turers (OEM's) may delete the identity of compon-t3 used in their product, it may be necessary to consult with the

'li to make the required determination.)

2.

Operating facilities using said actuators in safety-

.ated systems should:

l l

l l

_ ~. - - _.

IE Bulletin No. 80-09 April 17, 1980 Page 2 of 2 Review system functional testing to determining that equipment a.

using the subject actuators are periodically teste'd.

b.

Examine test records to determine whether the functional test results conform to system requirements; Verify that ample margin exists with respect to thrust c.

delivered to the load for long term operation considering improper spring material and methods used to select the actuator for a particular application.

d.

Take any corrective actions required by the results of items a.

b. and c.,

above.

3.

Facilities with construction permits using said actuators in safety-related systems should:

Reevaluate actuator size selection in light of the possibility a.

of using actuators with defective springs or which were sized by the " Selection Nomograph" without accounting for internal friction and hydraulic resistance.

Said reevaluation should assure that the actuators will perform their intended function, b.

Modify equipment qualification, preoperational and startup test prograas, as necessary, to demonstrate the functional adequacy of the Hydramotor Actuator in light of the aforementioned concerns.

Particular attention should be given to the possi-bility of defective springs taking a permanent set.

Note: ITT General Controls is presently performing actuator testing on units supplied by one of their customers (American Warming & Ventilating Co. Inc.) and revising the methods used to select actuator application.

Each licensee er holder of a construction permit should report to the NRC within 60 days >f the results of actions taken, any corrective actions required, and the date wri.n corrective actions were or will be completed.

The report should be addressed to:

U. S. Nuclear Regulatory Commission Director of Reactor Construction Inspection, 0.I.E.

Washington, D.C.

20555 A copy of the report should be sent to the Region Office.

~

Approved by GAO, B180225 (R0072); clearance expires 7/31/80.

Approval was given ender a blanket clearance specifically for identified generic problems.

(_.

Attachment No. 1 Customers

, Quantities ACDC Inc, Cincinnati, OH 27 American Warming & Ventilating Co., Inc.

Maumee, OH 145 Copes Vulcan, Inc.

Lake City, PA 2

Fisher Controls Co., Inc.

Marshalltown, IA 38 Fisher Controls Co., Inc.

Corapolis, PA 4

General Signal Corporation West Warwick, RI 2

ITT Hammel-Dahl Warwick, RI 4

Joy Manufacturing New Philadelphia, OH 18 Masoneilan International, Inc.

Norwood, MA 10 Pacific Air Products Santa Ana, CA 16 Posi Seal International, Inc.

No. Stonington, CT 14 Powers Regulator Co.

I Portland, OR

~

1 Powers Regulator Co.

Skokie, IL 74 Ruskin Manufacturing Co.

Grandview, M0 4

Valtek, Inc.

Springville, UT 9

TOTAL 368

r IE Bulletin No. 80-09 Enclosure

/

April 17, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

80-08 Examination of Containment 4/7/80 All power reactors Liner Penetration Welds with a CP and/or OL no later than 4/7/80 80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and Failure BWR-4 facilities with an OL 80-06 Engineered Safety Feature 3/13/80 All power reactor (ESF) Reset Controls facilities with an OL 80-05 Vacuum Condition Resulting 3/10/80 All PWR power reactor In Damage To Chemical Volume facilities holding Control System (CVCS) Holdup OLs and to those with Tanks a CP 80-04 Analysis of a PWR Main 2/8/80 All PWR reactor facilities Steam Line Break With holding OLs and to those Continued Feedwater nearing licensing Addition 80-03 Loss of Charcoal From 2/6/80 All holders of Power Standard Type II, 2 Inch, Reactor OLs and cps Tray Adsorber Cells 80-02 Inadequate Quality 1/21/80 All BWR licenses with Assurance for Nuclear a CP or OL Supplied Equipment 80-01 Operability of ADS Valve 1/11/80 All BWR phwer reactor Pneumatic Supply facilities with and OL 79-01B Environmental Qualification 1/14/80 All power reactor of Class IE Equipment facilities with an OL 79-28 Possible Malfunction of 12/7/79 All power reactor Namco Model EA 180 Limit facilities with an Switches at Elevated OL ur a CP Temperatures i

l

. - ~.... _. -

.