ML19309G292

From kanterella
Jump to navigation Jump to search
Forwards marked-up Interview Summary of W Owen,Duke Power Co
ML19309G292
Person / Time
Site: Crane 
Issue date: 10/16/1979
From: Owen W
DUKE POWER CO.
To: Deyoung R
NRC - NRC THREE MILE ISLAND TASK FORCE
Shared Package
ML19309G293 List:
References
TASK-TF, TASK-TMR 791009-01, 791009-1, NUDOCS 8005050520
Download: ML19309G292 (1)


Text

r DmCE POWER COMPANY

~{

POWER HUILDING, CH A H UYrrn, N. C. 282 4 2 W. M. OWEN (704) 3734120 e

.. e. ion vaca cessios.,

October 16, 1979 Mr R C DeYoung, Deputy Staff Director NRC/TMl Special Inquiry Group U S Nuclear Regulatory Commission Washington, D C 20555 RE: NTFTH 791009-01

Dear Mr DeYoung:

Enclosed is a marked up copy of the file memorandum prepared by Mr Hartmut Schier1Ing.

It was a good representation of what I said in most instances.

I've marked those places where I think corrections need to be made.

Af ter talking with Mr Sch; cling and checking with other Duke personnel who were at Three Mile Island, I find that I was mistaken about the references to things that occurred Monday, Tuesday, and Wednesday and have so corrected those dates.

Very truly yours, A10au-W H Owen WH0/mk Enclosure APROGgD tOB 4

0 e

t

=

5 th Anniversary

  • %gaowco #.$'

I