ML19309G151

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/80-07 on 800206-08.No Noncompliance Noted
ML19309G151
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 03/20/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19309G152 List:
References
NUDOCS 8005050040
Download: ML19309G151 (2)


See also: IR 05000373/1980007

Text

{{#Wiki_filter:__ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ 8040soyh e. f 8 'o_ UNITED STATES ! " , v., ([ NUCLEAR REGULATORY COMMISSION TO ""#, f r REGION ill

%, \\/[[ 15 799 ROOSEVELT ROAD i o,, GLEN ELLYN. 0LLINOIS 60137

  • ...

,. . MAR 2 01000

DBcket No. 50-373

Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen: This refers to the inspection conducted by Messrs. D. E. Miller and L. J. Hueter of this office on February 6-8, 1980, of activities at LaSalle County Nuclear Station, Unit 1 authorized by NRC Construction Permit No. CPPR-99 and to the discussion of our findings witt. Mr. Diederich and others at the conclusion of the inspection. The enclosed copy of our inspection rep,rt identifies areas examined during the inspection. Within these treas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. No items of noncompliance with NRC requirements were identified during the course of this inspection. Based on discussions with your representatives at the site, we under- stand that you will (1) perform a management-controlled audit of your radioactive material shipping program before fuel load, and (2) submit the Rad / Chem Supervisor's qualifications to NRR, who will determine whether he meets the requirement for Radiation Protection Manager spec- ified in Regulatory Guide 1.8. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room, except as follows. If this report contains information that you or your contractors believe to be proprietary, you must apply in writing to this office, within twenty days of your receipt of this letter, to withhold such information from public disclosure. The application must i , ]

i Commonwealth Edison -2- e Company g4g g - include a full statement of the reasons for which the information is con- sidered proprietary, and should be prepared so that proprietary i,nforma- tion identified in the application is contained in an enclosure to the application. We will gladly discuss any questions you have concerning this inspection. Sincerely, ~ f. 't - kC" A. B. Davis, Chief Fuel Facility and Materials Safety Branch Enclosure: IE Inspection Report No. 50-373/80-07 cc w/ encl: Mr. D. L. Peoples, Director of Nuclear Licensing Mr. L. J. Burke, Site Project Superintendent Mr. T. E. Quaka, Quality Assurance Supervisor Mr. R. H. Holyoak, Station Superintendent Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General }}