ML19309G040

From kanterella
Jump to navigation Jump to search
Forwards RO Re Reactor Feed Pump Trip
Date released: 11/19/2019 Download: ML19309G040


Ro:On 800206,HPCI Was Manually Started & Injected Into Reactor Vessel to Maintain Reactor Vessel Water Inventory Following Trip of Reactor Feed Pump.Caused by Loss of Reactor Feed Pump Loop Seal.Hpci Was Shut Down
ML19309G044
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/24/1980
From:
GEORGIA POWER CO.
To:
References
Download: ML19309G044 (1)
Forwards RO Re Reactor Feed Pump Trip
ML19309G039
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/24/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309G039 (1)