800430
nc
'
'o,
UNITED STATES
8'
'i
NUCLEAR REGULATORY COMMISSION
$
20 - E
REGION ill
g
f
799 ROOSEVELT ROAD
,
D
GLEN ELLYN,ILLINotS 6o137
%..,+o
NAR 21 E60
..
Docket No. 50-546
Docket No. 50-547
Public Service of Indiana
ATTN:
Mr. S. W. Shields
Vice President - Electric
System
1000 East Main Street
Plainfield, IN 46168
Gentlemen:
This refers to the inspection conducted by Mr. J. J. Harrison of this
office during the period of January 7-31, 1980, of activities at Marble
Hill Generating Station, Units 1 and 2, authorized by NRC Construction
Permits No. CPPR-170 and No. CPPR-171 and to the discussion of our
findings with Messrs. L. A. Crews, G. Brown and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report Identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as described in the enclosed
Appendix A.
It should be noted that the items of noncompliance iden-
tified in Appendix A are associated with the Quality Assurance Program
problems that took place prior to the shutdown of safety related con-
struction work. Even though construction work is still stopped, you
should give special attention to initiating corrective action dealing
with the storage and preservation activities and surveillance of these
activities. The establishment and implementation of a cound program
is extremely important during this period. These controls will be
confirmed prior to the unconditional lifting of the Order.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office within
thirty days of your receipt of this notice a written statement or explana-
tion in reply, including for each item of noncompliance: (1) corrective
!
,
l
l
i
e
-*%
<.-e
. - = =
. *
4
+m
s
Public Service of Indiana
-2-
'
MAR 21 E80
action taken and the results achieved; (2) corrective action to be taken
to avoid further noncompliance; and (3) the date when full compliance
will be achieved.
.
Is accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2*, Title 10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
Public Document Room, except as follows.
If the enclosures contain
information that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty days of your receipt
of this letter, to withhold such information from public disclosure. The
application must include a full statement of the reasons for which the
information is considered proprietary, and should be prepared so that
proprietary information identified in the application is contained in an
enclosure to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
r
James G. Keppler
Director
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-546/80-03 and
No. 50-547/80-03
cc w/ enc 1:
C. Kammerer, CA
H. Thornburg, IE
Mr. G. N. Brown, Project
Director
Central Files
Reproduction Unit NRC 20b
Local PDR
LeBoeuf, Lamb, Leiby & MacRae
Mr. Dave Martin, Office of
Attorney General
Mr. John R. Galloway, Staff
Director, Environment, Energy
and Natural Resources Subcommittee