ML19309F664
| ML19309F664 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/29/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19309F665 | List: |
| References | |
| NUDOCS 8004300293 | |
| Download: ML19309F664 (2) | |
See also: IR 05000397/1980001
Text
IlC
a ~ ,,,
!('
o.
UNITED STATES
g
gg
NUCLEAR REGULATORY COMMISSION
B0048 es%4r2
- .
-l
REGION V
V
o
g
1990 N. CALIFORNIA BOULEVARD
g
e
SUITE 202, WALNUT CREEK PLAZA
- ,,,e
WALNUT CR E E K, CALIFORNI A 94596
FEB 2 : 1980
Docket No. J')-397
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: Mr. N. O. Strand
Managing Director
Gentlemen:
Subject:
NRC Inspection of WNP Unit 2
This refers to the inspection conducted by Messrs. D. P. Haist and
J. O. Elin of this office on January 15-18, 1980 of activities authorized
by NRC Construction Permit No. CPPR-93, and to the discussion of our
findings held by Messrs Haist and Elin with Mr. W. C. Bibb and other
members of your staff at the conclusion of the inspection.
Areas examined durir.g this inspection are described in the enclosed
,
inspection report. Within these areas, the inspection consisted of
!
selective examinations of procedures and representative records, interviews
with personnel, and cbservations by the inspectors.
j
The inspection identified one continuing item of noncompliance concerning
the adequate closure of instrument sensing lines.
This item was initially
identified in NRC Inspection Report 50-397/79-16.
Response to the
original item of noncompliance was provided in your letter of February 4,1980.
The corrective actions identified in your letter will be examined
during a future inspection.
No additional response regarding this item
is required at this time.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection repo"t will be placed in the NRC's Public
Document Room.
If this report contains any infonnation that you believe
l
l
'
Washington Public Power Supply System
-2-
to be proprietary, it is necessary that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
hj/ w , wa-
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
A.
IE Inspection Report
No. 50-397/80-01
cc w/o enclosure A:
M. E. Witherspoon, Division Manager
.
Quality Assurance, WPPSS
W. C. Bibb, Project Manager
WNP-2 Project