Forwards IE Insp Rept 50-397/80-01 on 800115-18
ML19309F664
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/29/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19309F665 List:
References
NUDOCS 8004300293
Download: ML19309F664 (2)


See also: IR 05000397/1980001

Text

IlC

a ~ ,,,

!('

o.

UNITED STATES

g

gg

NUCLEAR REGULATORY COMMISSION

B0048 es%4r2

.

-l

REGION V

V

o

g

1990 N. CALIFORNIA BOULEVARD

g

e

SUITE 202, WALNUT CREEK PLAZA

  • ,,,e

WALNUT CR E E K, CALIFORNI A 94596

FEB 2 : 1980

Docket No. J')-397

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Mr. N. O. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection of WNP Unit 2

This refers to the inspection conducted by Messrs. D. P. Haist and

J. O. Elin of this office on January 15-18, 1980 of activities authorized

by NRC Construction Permit No. CPPR-93, and to the discussion of our

findings held by Messrs Haist and Elin with Mr. W. C. Bibb and other

members of your staff at the conclusion of the inspection.

Areas examined durir.g this inspection are described in the enclosed

,

inspection report. Within these areas, the inspection consisted of

!

selective examinations of procedures and representative records, interviews

with personnel, and cbservations by the inspectors.

j

The inspection identified one continuing item of noncompliance concerning

the adequate closure of instrument sensing lines.

This item was initially

identified in NRC Inspection Report 50-397/79-16.

Response to the

original item of noncompliance was provided in your letter of February 4,1980.

The corrective actions identified in your letter will be examined

during a future inspection.

No additional response regarding this item

is required at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection repo"t will be placed in the NRC's Public

Document Room.

If this report contains any infonnation that you believe

l

l

'

Washington Public Power Supply System

-2-

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

hj/ w , wa-

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

A.

IE Inspection Report

No. 50-397/80-01

cc w/o enclosure A:

M. E. Witherspoon, Division Manager

.

Quality Assurance, WPPSS

W. C. Bibb, Project Manager

WNP-2 Project