80 0.4 290 0 N Tic t@%g UNITED STATES ef, J.,
NUCLEAR REGULATORY COMMIS510N i
d S
REGloN ill D
"f 799 ROOSEVELT ROAD
- t,,
/
cten ettyn, stunOrs sonar APR 14 580 Docket No. 50-341 The Detroit Edison Company ATTN: Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
Thank you for your interim report dated March 21, 1980, pursuant to 10 CFR 50.55(e) regarding termine.tions to receptacles in the main control room panels 601,602, and 603. Per our conversation on April 2, 1980, with the Detroit Edison Construction QA Manager, we understand that you will supplement your interim report to identify the apparent cause for the loose connections and broken strands.
We will review your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely, s
A S
G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney l
l 800.429005)
,..e
-.m.v.
-