ML19309F185

From kanterella
Jump to navigation Jump to search
Forwards LER 80-027/03L-0
Date released: 11/19/2019 Download: ML19309F185


LER 80-027/03L-0:on 800325,while Performing Periodic Test 1.7.1PC,leak Detection Level Switch for HCU 26-47 Did Not Actuate.Caused by Contacts on Switch Not Meeting.Switch Replaced
ML19309F191
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/22/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309F191 (1)
Forwards LER 80-027/03L-0
ML19309F184
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/22/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309F184 (1)