Forwards IE Insp Rept 50-358/80-03 on 800122-24 & Notice of Violation
ML19309E318
Person / Time
Site: Zimmer
Issue date: 02/29/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML19309E320 List:
References
NUDOCS 8004210134
Download: ML19309E318 (2)


See also: IR 05000358/1980003

Text

pM tuq'o

g

8

UNITED STATES

8 ' ., ,

NUCLEAR REGULATORY COMMISSION

/D

5

e

REGION 111

Q

e'['

799 ROOSEVELT ROAD

,

,

GLEN ELLYN. ILLINots 60137

g

....+

9 1980

Docket No.

.-358

Cincinnati Gas and Electric

Company

ATTN:

Mr. Earl A. Borgmann

Senior Vice President

Engineering Services

and Electric Production

139 East 4th Street

Cincinnati, OH 45201

Gentlemen:

This refers to the inspection conducted by Messrs. T. Vandel and E. J. Gallagher

of this office on January 22-24, 1980, of activities at the Wm. H. Zimmer

Power Station authorized by NRC Construction Permit No. CPPR-88 and to the

discussion of our findings with Mr. B. K. Culver and others of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed Appendix

A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance: (1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will be

achieved.

The item of noncompliance identified in the Notice of Violation was pre-

viously identified as an unresolved item in report 358/78-03-02.

Please

give this item your particular attention. The response should address

each individual item and the corrective action taken.

l

In addition to the above, the five unresolved items described in paragraph

2 also requires your attention.

The CG&E response to IE Bulletin 79-02 is

considered unacceptable by the NRC staff in that the incorrect loading

l

8004210G4

..

Cincinnati Gas and

-2-

.

Electric Company

tEB is 153c

(OBE versus SSE) and factor of safety (2 versus 4) was used in the analysis

and design of pipe supports using concrete expaasion anchors. Also the

response to item 5(a) of the bulletin was incomplete.

Please provide a

revised response to IE Bulletin 79-02 at your earliest convenience in

order for our review to proceed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

e

4N

, , , _ .

G. Fiore11i, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-358/80-03

cc w/encls:

Mr. J. R. Schott, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power Siting

Commission

Citizens Against a Radioactive

Environment

-

Helen W. Evans, State of Ohio

W. Laudan, IE:HQ

1